Laserfiche WebLink
<br />. ~ <br /> <br />CONTENTS (Continued) <br /> <br />Page <br /> <br />Chapter IX <br /> <br />Operation, maintenance, and replacements <br />(continued) <br />Operation, maintenance, and replacements <br />estimate . , . <br />Personnel . . . . . <br />Equipment and costs <br />Annual supplies . . <br />Power . . . . . . . <br />Major replacements. <br />Direct pumping plant operation and <br />maintenance costs <br />Annual cost summary . . . . . . . . <br /> <br />46 <br />46 <br />46 <br />47 <br />47 <br />47 <br /> <br />49 <br />49 <br /> <br />MAPS, DRAWINGS, AND CHARTS <br /> <br />/:::Q., <br />.', <..:.'j <br />'.~, . <br /> <br />Paradox Valley Unit, General Map (1294-400-24). <br />Control schedule (PF-2) . . . . . . . . . . . . <br />Brine well field, general layout (1294-400-26). <br />Test well installation (1294-400-36). . . . . . <br />Hydrogen Sulfide Stripping Plant, perspective (1294-D-ll) <br />Hydrogen Sulfide Stripping Plant, site plan (1294-D-9). <br />Hydrogen Sulfide Stripping Plant, floor plan and eleva- <br />tion (1294-D-IO). . . . . . . . . . . .. .... <br />Hydrogen Sulfide Stripping Plant, equipment and piping <br />plan (l294-D-7) . . . . . . . . . . . .. " . . <br />Hydrogen Sulfide Stripping Plant, equipment and piping <br />plan (1294-D-8) . . . . . . . . . . . . . <br />Brine pipeline, general plan and profile (1294-D-4) <br />Brine Pumping Plant No. 2 (1294-D-3). <br />Reservoir capacity allocations. . . . <br />Radium Dam and Dike (1294-D-5). . . . <br />Radium Evaporation Pond, right-of-way <br />Project cost estimate (October 1977). <br />Construction cost estimate (October 1977) <br />Project cost estimate (May 1977). . . <br />Construction cost estimate (May 1977) . . <br /> <br />Frontispiece <br />6 <br />10 <br />11 <br />14 <br />15 <br /> <br />16 <br /> <br />17 <br /> <br />18 <br />21 <br />24 <br />29 <br />30 <br />32 <br />50-52 <br />53,54 <br />54,55 <br />56-75 <br /> <br />i';' 1 50 <br /> <br />iii <br />