My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04649
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04649
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:14:59 PM
Creation date
10/12/2006 12:30:52 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.150
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
2/1/1990
Title
Draft 1989 Annual Report: Grand Valley Salinity Control Project Monitoring and Evaluation Program
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />co <br />In <br />M <br />,=) <br />~) Other benefits have been uncovered on some sites. These additional <br />'.:::c benefits include less ditch spraying, improvements in cultural <br />operation efficiency, easier harvesting, fewer field weed problems, <br />and increased production acreage. It should be noted that the average <br />figures reported here mask the range of site specific benefit levels <br />real ized by GVSP improvements. <br /> <br />. <br /> <br />. <br /> <br />------------------------------------------------------------------ <br /> <br />TABLE 11 <br /> <br />Input Changes Due to Irrigation System Improvements <br /> <br />INPUT UNIT BEFORE AFTER CHANGE 1/ <br /> Irrigation Labor <br /> crop hrs/ac./season 2.73 .93 1.80 <br /> orchard hrs/ac./season 22.25 2.94 19.31 <br /> Field ~la i ntenance Labor <br /> crop hrs/ac./season .48 .11 .37 <br /> orchard hrs/ac./season 6.66 1.80 5.36 <br /> De I ivery Maintenance Labor <br /> crop hrs/100ft/season 1.20 .18 1.02 <br /> orchard hrs/100ft/season 4.09 .24 3.85 <br /> Field Machine Time <br /> crop hrs/ac./season .10 .02 .08 <br /> orchard hrs/ac./season .38 .00 .38 <br /> De I I ve '-y Machine Time <br /> crop hrs/100ft/season .97 .00 .97 <br /> ol-cha,"d hrs/100ft/season .90 .00 .90 <br />1/ rigures are averaged based on acreage weights, 1985-1989 <br /> <br />---------------------------------------------------------------------- <br /> <br />Table 12 displays the yield increases reported after system <br />improvements were installed. Generally field crop yields are impacted <br />less than the orchard crops. Orchard sites monitored tended to be <br />irrigated under very inefficient systems in the before condition. The <br />sizeable increases reported are due to improved water adequacy, more <br />timely watering, and more even water application. The typical <br />producer is realizing a yield improvement as a result of applying GVSP <br />salinity control practices. <br /> <br />34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.