Laserfiche WebLink
<br />~ <br />~ <br /> <br />~' <br />, . <br />- <br /> <br />,... <br />-- <br /> <br />the extent of the irrigated land in this division is a matter for <br />local dec:l.sion, and the irrigated. area would become established by <br />contracts for supplemental storage water and by irrigation practice. <br /> <br />Operation of a reservoir at the 'state Line site would alleviate <br />future damages to New Mexico irrigation systeIDS from floods, such as <br />occurred :l.n August 1919, August 1927, July 1929, August 1930, August <br />1934, and July 1937, when ditch structures were washed out, with the <br />result that little or no water was diverted during the remainder of <br />the irrigation season, <br /> <br />A development period of three years is recommended (in addition <br />to the 2-year construction period), prior to initiation of repayment <br />of construction charges, in order to permit water users to become <br />established on dormant lands. La Plata Project costs and repayment <br />ability are summarized as follows: <br /> <br />Colorado Division <br /> <br />Total construction costs <br /> <br />$1,474,000 <br /> <br />Repayment by irrigators for supplemcntal stor- <br />age water, 10,600 acre-feet at $1.40 per acre- <br />foot for 40 years <br />Beyond repayment ability of irrigators <br />Annual cost to irrigators <br />Construction charges 10,600 acre-feet <br />$1,40 per acre-foot <br />Operation and maintenance of reservoir <br />and canals <br /> <br />Annual cost per acre-foot <br /> <br /> 593,600 <br />" 880,400 <br />" <br />at <br />"' 14,840 <br /> 4,000 <br />$ 18,840 <br /> $1. 78 <br /> <br />New.Mexico Division <br /> <br />Total construction costs <br />flood control benefit <br /> <br />$2,326,000 <br />400,000 <br />$1,926,000 <br /> <br />Repayment by irrigators for regulated water <br />supply from storage for 3,800 acres at $1,80 <br />per acre for 40 years <br />Beyond repayment ability of irrigators <br /> <br />273,600 <br />;Pl,652, 400 <br /> <br />Annual cost to irrigators <br />Construction charges 3,800 acr'es at <br />$1.80 per acre <br />Operation and maintenance of reservoir <br />Chargeable to flood control <br />Chargeable to irrigation <br /> <br />(;; 6,840 <br /> <br />$4,500 <br />2,500 <br /> <br />Total <br /> <br />$ <br /> <br />2,000 <br />8,840 <br />$2,33 <br /> <br />Annual cost per acre <br /> <br />2 <br />