Laserfiche WebLink
<br />00 <br />c: <br /> <br />-. <br />'. <br /> <br />c <br /> <br />The reservoir would submerge three miles of Colorado Highway <br />No. l40, two miles of 6-inch gas line, and some miscellaneous improve- <br />ments. Right-of-ways costs are estimated at $65,000. <br /> <br />~. <br /> <br />No new canals or lateral:> are needed to distribute project water <br />to the New Mexico division4 <br /> <br />Cost of Construction <br /> <br />The costs of construction of the project, estimated for conditions <br />as of January 1, 1940, are summarized as follows: <br /> <br />Qolorado Division <br /> <br />Long Hollow Dam, Dike, and Reservoir <br />Feeder Canal <br />OUtlet Canal <br />Investigations and Surveys <br /> <br />$l,32l,800 <br />42,400 <br />67,800 <br />42,000 <br /> <br />Total for Colorado Division <br /> <br />$1,474,000 <br /> <br />New Mexico Division <br /> <br />Total for New Mexico Division <br /> <br />$2,298,000 <br />28,000 <br /> <br />$2,326,000 <br /> <br />$3,800,000 <br /> <br />State Line Dam and Reservoir <br />Investigations and Surveys <br /> <br />Total Costs of Construction <br /> <br />31 <br />