My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04621
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04621
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:14:53 PM
Creation date
10/12/2006 12:27:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Missouri River basin Comprehensive Framework Study-Volume 1- Report
State
CO
Basin
South Platte
Water Division
1
Date
12/1/1971
Author
Missouri Basin Inter
Title
Missouri River Basin Comprehensive Framework Study - Volume I - Report
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CONTENTS (Continued) <br /> <br />Page <br /> <br />MUNICIPAL AND RURAL DOMESTIC, INDUSTRIAL, AND LIVESTOCK <br />WATERSUPPLY _ _ _ - - - . . <br />ELECTRIC POWER . _ _ _ . - - - . <br />FLOOD AND EROSION CONTROL <br />FISH AND WILDLIFE _. - - <br />OUTDOOR RECREATION _ _ <br />WATER QUALITY CONTROL <br />NAVIGATION .. _ _ _ _ - - <br />ADDED WATER YIELD MANAGEMENT <br />ENVIRONMENTAL CONSIDERATIONS <br /> <br />CHAPTER 9 - PLAN FORMULATION - <br />PLANNING CONCEPTS _.. - - - . <br />PLAN FORMULATION STRUCTURE <br />PLANNING CRITERIA _ _ . _ _ <br />COST ESTIMATING CRITERIA .. _ <br />COST SHARING _ _ _ _ . . - - - - - <br />BASIN AND SUBBASIN ANALYSES <br /> <br />CHAPTER 10 - THE FRAMEWORK PLAN <br />THE BASIN FRAMEWORK PLAN _.. <br />LAND AND WATER CHANGES . _ _ _ <br />FUTURE DEVELOPMENTS ON THE MISSOURI RIVER <br />UPPER MISSOURI SUBBASIN . <br />YELLOWSTONE SUBBASIN _ _ <br />WESTERN DAKOTA SUBBASIN <br />EASTERN DAKOTA SUBBASIN <br />PLATTE-NIOBRARA SUBBASIN <br />MIDDLE MISSOURI SUBBASIN <br />KANSAS SUBBASIN _ _ _ . . . . <br />LOWER MISSOURI SUBBASIN <br /> <br />CHAPTER 11 - ASSESSMENT OF FRAMEWORK PLAN RESPONSES TO NEEDS. . - . <br />RESPONSES TO FUNCTIONAL NEEDS _ . . . . _ _ _ _ _ _ . _ _ _ _ _ . . <br />CHAPTER 12 - DISCUSSION, CDNCLUSIONS, AND RECOMMENDATIONS <br />PLANNING OBJECTIVES _.... <br />OTHER PLAN CONSIDERATIONS <br />PLAN IMPLEMENTATION . . . . <br />KEEPING THE PLAN CURRENT <br />CONCLUSIONS . . . . <br />RECOMMENDATIDNS _ _ _ _ _ _ <br /> <br />_124 <br />_127 <br />_130 <br />_134 <br />.137 <br />_140 <br />_143 <br />_144 <br />_145 <br /> <br />_149 <br />_149 <br />.149 <br />_150 <br />_152 <br />_152 <br />_154 <br /> <br />_155 <br />_155 <br />.162 <br />_165 <br />_165 <br />_177 <br />_187 <br />_196 <br />_205 <br />_218 <br />_226 <br />_236 <br /> <br />_245 <br />_245 <br />_259 <br />_259 <br />_264 <br />.265 <br />_270 <br />_271 <br />_273 <br /> <br />TABLES <br /> <br />Number <br /> <br />1 Subbasin Study Areas, Missouri River Basin .......... <br />2 Area and Population by State, Missouri River Basin and Region <br />3 Number of Counties by States Within the Missouri Basin . . . . <br />4 Number of Incorporated Urban Places Over 2,500 Population - 1960 - Missouri Region <br />5 Historical Income and Earnings, Missouri Region _. _ _ _ _ _ _ . . _ _ _ . . <br />6 Historical Earnings Per Employee By Major Employment Divisions, Nation and <br />Missouri Region ............................... <br />7 Historical Earnings Per Employee - Missouri Region, Subregions, and SMSA's As A <br />Percent of National Average . . . . . . . . <br />8 Land and Water Areas ............ <br />9 Summary of Major land Use and Water Areas <br /> <br />Page <br />_ 14 <br />_ 31 <br />_ 32 <br />33 <br />35 <br /> <br />35 <br /> <br />36 <br />37 <br />40 <br /> <br />iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.