Laserfiche WebLink
<br />. i:," ~) <br /> <br />'0 <br /> <br /> <br />. <br />Adequate releases of this higher quality water will be made to <br />the stream below the dam to maintain an improved stream fishery. With <br />this and the high quality fishing an~icipated in the project reservoirs,. <br />the Fish and Wildlife Serviceestimates an additional 42,000 man-days of <br />fishing annually will develop with the project. The plan also provides <br />for development of a waterfowl production area by the Fish and Wildlife <br />Service at the upper end of Ridgway Reservoir in the area that may <br />otherwise have a mud-flat appearance. <br /> <br />Space will be provided in Ridgway Reservoir to catch the high flood <br />flows of the Uncompahgre River that have in the past caused considerable <br />damage to property and facilities in the valley between Ridgway anq <br />Delta, Colorado. <br /> <br />,.. <br /> <br />It is understood there may be some concern in the area that Ridgway <br />Reservoir may inundate the community cemetery. Ridgway Cemetery is <br />located about 1-1/2 miles west of the Ridgway Reservoir maximum high <br />water line and, the Portland Cemetery, along the highway between Ridgway <br />and Ouray, is about 2 miles south of the upper limits of the reservoir. <br />These cemeteries would in no way be affected by the project reservoirs. <br /> <br /> <br />,:~? <br />;<':-~ <br />r'.<'" <br />~. ." <br />, !.~~~:- <br /> <br />Abandonme~t of the railroad facili~ at Ridgway are not anti~ipated. <br />Project plans ~rovide for relocation of the terminal facilities frOm the <br />town of Ridgway to a point below Ridgway dam, about 1.5 miles from the <br />present 10cati6n, and a net cost of about $260,000 has been included <br />in the project,cost estimates for relocation of these facilities. :The <br />new terminal f~cilities should have a higher assessed valuation th4n <br />the old existi~g facilities. <br /> <br /> <br />It has been explained to the residents of Ridgway and other. i <br />property ownerS within the reservoir basins :that they will be adequately <br />compensated for the right-of-way, both individual and community property, <br />required for project construction. On June '9, 1965, one of several public <br />meetings was h~ld in Ridgway for discussions and recommendations by <br />Ridgway residents concerning the proposed location of the reservoi~ and <br />relocation or ~eestablishment of the town of Ridgway. The mayor aid about <br />50 residents of the town participated in the meeting. They all expressed <br />support for the project and many of them were in favor of relocati~g the <br />town to the east or north of the new lake when it became a reality; <br />Attached is a copy of the resolution passed unanimously by the towq <br />residents at that meeting. <br /> <br /><:'-.>1,; <br /> <br />~;~;r;~ <br /> <br />~ <br /> <br />.-.-t <br /> <br />As indicated in the second attachment, project development wo~ld <br />increase the assessed valuation of taxable property in Ouray County <br />by about $2,000,000 and would increase the personal income in the : <br />area by over $$,000,000 per year. This would have a very beneficiAL <br />economic effect on Ouray County and the surrounding area. <br />