Laserfiche WebLink
<br />TABLE OF CONTENTS <br /> <br />Page <br /> <br />. Frontispiece <br /> <br />GENERAL MAP, DRAWING NO. 998-300-5. . . . <br />SUMMARY, CONCLUSIONS, AND RECOMMENDATIONS <br /> <br />A. Summary. . , <br />B. Conclusions. <br /> <br />1. General. , <br />2, Future Quality of Water Delivered to Mexico. <br /> <br />C, Recommendations. . <br />D. Continuing Studies <br /> <br />PART 1. INTRODUCTION <br /> <br />A. <br />B. <br />C. <br />D. <br />E. <br /> <br />Background <br />Purpose. . <br />Scope. . . <br />Water Treaty <br />Objectives . <br /> <br />. . . . . . . . . . . . <br /> <br />of 1944 between United States and Mexico. <br /> <br />PARr II. HISTORY OF IRRIGATION AND DRAINAGE. <br /> <br />A. General. <br />B. Yuma Project . <br />C. Yuma Auxiliary Project <br />D. Gila Project <br /> <br />1. Yuma Mesa Division <br />2. Wellton-Mohawk Division. <br /> <br />E, Palo Verde Irrigation District <br />F, Colorado River Indian Reservation. <br />G. Mexico. . . . . . . . . . . . . . <br /> <br />PART III. HYDROLOGY OF TIlE LOWER COLORADO RIVER BELOW HOOVER rAM <br /> <br />f>.. <br /> <br />Water Supply . . . . . . . . . . . . <br /> <br />. . . . . . . . . . <br /> <br />i <br /> <br />i <br />v <br /> <br />v <br />vii <br />viii <br />viii <br />1 <br />1 <br />3 <br />3 <br />5 <br />6 <br />7 <br />7 <br />7 <br />9 <br />9 <br />9 <br />11 <br />12 <br />13 <br />13 <br />17 <br />17 <br /> <br />. <br /> <br />~.I <br /> <br />1. Description of Physical Features Below (and Including) <br />Hoover Dam . . . . . . . . . . . . . . . . . ., 17 <br />2. Historical Flows Prior to Hoover Dam Construction. 23 <br />3. Operation of River - Average Annual Supply and <br />Requirements 23 <br /> <br />B. Water Quality. . . <br /> <br />x <br /> <br />29 <br />