My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04615
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04615
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:56:20 PM
Creation date
10/12/2006 12:27:35 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8278.400
Description
Title I - Mexican Treaty
Basin
Colorado Mainstem
Date
2/1/1963
Author
USDOI/BOR
Title
Special Studies - Delivery of Water to Mexico
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />the United States are operating successfully with a higher diss01ved <br /> <br /> <br />s01ids content in their irrigation water than will be present in the <br /> <br /> <br />water de1ivered to Mexico under the proposed p1an. <br /> <br /> <br />C. RecoIlllDendations <br /> <br /> <br />It is recommended that: <br /> <br /> <br />(1) Necessary action be initiated to allot 30,000 to 35,000 <br /> <br /> <br />additional acres of cotton to the Wellton-Mohawk <br /> <br /> <br />District, connnencing with the 1963 crop year. <br /> <br /> <br />(2) CongI'essional approval and funds be obtained to start <br /> <br /> <br />immediate construction under Phase 1. <br /> <br /> <br />(3) Upon receiving CongI'essional approval, collection of <br /> <br /> <br />fie1d data and design studies for Phase 2 construction <br /> <br /> <br />be initiated, including repair of gates at Imperial Dem. <br /> <br /> <br />(4) Proper action be initiated to transfer construction of <br /> <br /> <br />the Texas Hill-Gi1a Siphon 1evee and f100dway system <br /> <br /> <br />from the Corps of Engineers to the Bureau of <br /> <br /> <br />Reclamation so that the f100d protection system can <br /> <br /> <br />be constructed simultaneous1y with the other proposed <br /> <br /> <br />works in Phase 2. <br /> <br /> <br />(5) Additional studies (discussed be10w) be started at the <br /> <br /> <br />earliest date. <br /> <br /> <br />D. Continuing Studies <br /> <br /> <br />Due to the comp1exi ty of the prob1ems inv01ved, the international <br /> <br /> <br />imp1ications, the short period of time available for this report's <br /> <br /> <br />preparation, and the need to expand investigations to other areas and <br /> <br /> <br />to refine present data, this report must be considered as an initial <br /> <br /> <br />report. <br /> <br />'. <br /> <br />\ <br /> <br />viii <br />
The URL can be used to link to this page
Your browser does not support the video tag.