My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04606
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04606
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:56:17 PM
Creation date
10/12/2006 12:27:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.400
Description
Fryingpan-Arkansas Project - Reports
State
CO
Basin
Arkansas
Water Division
5
Date
1/1/1960
Author
US DoI BoR
Title
Reevaluation Statement Fryingpan-Arkansas Project Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />- <br /> <br /> <br />- ...... ,- ~~ <br />1;', t.. i <br /> <br />~ <br /> <br />Project costs <br />(thous. of dollars) <br /> <br />Annual 0JY!g,R <br />(dollars) <br /> <br />Basic pro.;ect <br /> <br />Separable costs <br />Irrigation--Pueblo Reservoir <br />Power <br />Twin Lakes Reservoir <br />Pueblo Reservoir and <br />general property <br />Specific costs <br />Flood control--Pueblo Res. <br />Fish and t-dldlife <br /> <br />Total separable costs <br />Remaining joint costs <br /> <br />3,369 <br /> <br />1,390 <br /> <br />2,980 <br />625 <br />55,059 <br /> <br />780 <br /> <br />Net project costs <br /> <br />58,664 <br />4,006 <br />2,081 <br />68,120 <br />82.793 <br /> <br />150,913 <br /> <br />13.761 <br /> <br />16);,674 <br /> <br />11,860 <br />891.760 <br /> <br />..904,400 <br /> <br />12,690 <br />918,480 <br />114.040 <br /> <br />+,:03?,520 <br /> <br />193.280 <br /> <br />1,225,800 <br /> <br />Total basiC project <br /> <br />Mlnicipal water delivery system <br /> <br />Details of the cost allocation are shown on page 23. Capital <br />and OM!<R costs allocated to flood control and fish and wildlife are <br />nonreimbursable while the allocations to irrigation, municipal water, <br />and power are repayable. Investments for the last two purposes are <br />amortized with interest. <br /> <br />The reimbursable annual OM&R expenses associated with these <br />repayable capital costs are ~i87,420 for irrigation, $905,340 for <br />power, and $11,620 for municipal water supply. The annual 0JY!g,R <br />costs on the municipal water delivery system amount to ~~193,280. A <br />SUl1ll1JB.ry of the allocation of the net project cost, repayable interest <br />during construction and reimbursable investments is shown on page 24. <br /> <br />.. <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.