My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04606
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04606
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:56:17 PM
Creation date
10/12/2006 12:27:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.400
Description
Fryingpan-Arkansas Project - Reports
State
CO
Basin
Arkansas
Water Division
5
Date
1/1/1960
Author
US DoI BoR
Title
Reevaluation Statement Fryingpan-Arkansas Project Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2'/18 <br /> <br />Costs <br /> <br />The estimated construction cost of the Fryingpan-Arkansas <br />Project is $169,905,000. including the full cost of Ruedi Dam and <br />Reservoir. Interest during the l3-year construction period amounts <br />to $5,714,600. It is computed by relating the schedule of plant-in- <br />service to annual fund requirements and applying an interest rate of <br />2.5 percent on the net accumulation of construction expenditures for <br />each year. Total annual OM&R costs. including Ruedi Reservoir, <br />amount to $1,240.000. <br /> <br />Since the Fryingpan-Arkansas Project is obligated qy the <br />reVised operating principles for only a share of the Ruedi r.am and <br />Reservoir costs, it is necessary to deduct the costs of that feature <br />associated with western slope uses of water as set forth in the <br />Ruedi report. The following ta l:i1.e shows that deduction. <br /> <br />Item Total costs <br />Project cosr- $169,905,000 <br />Interest during construction 5.714.600 <br /> <br />Total investment $175,619,600 <br /> <br />Ruedi costs <br />assigned to <br />we stern <br />slope uses <br />115.231,000 <br />265.600 <br /> <br />$5.496,600 <br /> <br />Balance of <br />costs assigned <br />to Fryingpan- <br />Arkansas Project <br />$164,674;000 <br />5.449.000 <br /> <br />$170,123.000 <br /> <br />$ 1.225.800 <br /> <br />Annual OM&R costs <br /> <br />$ 1,240.000 $ 14.200 <br /> <br />Other costs must be considered in an economic analysis of <br />the project. Taxes foregone in the development of Federal hydro- <br />electric power are included as a cost item offsetting the same value <br />included in power benefits. An economic cost of $2.00 per acre-foot <br />of transmountain diversion is included for storage regulation provided <br />by the Upper Colorado River Storage Project. Preauthorization <br />investigations costs are excluded from the benefit-cost analysis. <br /> <br />" <br /> <br />Benefit-cost analysis <br /> <br />The next statistical table comprises a summary of the benefit- <br />cost aralyses for 50- and 100-year periods. The latter period is well <br />within the useful life of the project works. Except for Pueblo <br />Dam and Reservoir. a minimum of sedill'.ent deposition will occur in <br />the storage works. Ample sedi1nent space is provided in Pueblo <br />Reservoir for the 100-year period. <br /> <br />19 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.