Laserfiche WebLink
<br />Comparison of changes in plan and cost estimates <br />(Thousands of dollars) <br /> <br />Features <br /> <br />Price index date <br />Total project. cost <br /> <br />0- <br /> <br />Basic project features <br />Ruedi Dam and Reservoir <br />Aspen Dam and Reservoir <br />Sugar Loaf. ram. and Reservoir <br />Twin Lakes Dam and Reservoir <br />Salida Forebay <br />Sa2.ida Afterbay <br />Pueblo Dam and Reservoir <br />L'version works <br />h-:nter Creek - Aspen Canal <br />S;;i1th Side Collection System <br />No::-th Side Collection System <br />I',,"vingpan-Arkansas Divide Tunnel. <br />~"0wden Canal <br />Pc',rer canals <br />:'''"erplants <br />~,,':i tchyards <br />~'"jstations <br />?~ansmission lines <br />( neral property <br /> <br />H.D. 187 <br />(1953) <br /> <br />Jan.1953 <br /> <br />172,898 <br /> <br />151.,398 <br /> <br />8,102 <br />7,248 <br />10,222 <br />a/ <br />-310 <br />43,453 <br />748 <br />240 <br />9,058 <br />21,55'1 <br />10,095 <br />587 <br />12,639 <br />14,917 <br />3,885 <br />2,091 <br />5,079 <br />1,173 <br /> <br />S. 60 <br />H.R. 594 <br />(1957) <br />Oct.1956 <br />159,287 <br />145.996 <br />7,235 <br />6,615 <br />9,004 <br />Y <br />362 <br />36,926 <br />1,143 <br />250 <br />10,070 <br />15,956 <br />9,107 <br />483 <br />12,848 <br />23,813 <br />4,150 <br />1,509 <br />5,511 <br />1,014 <br /> <br />Current <br />plan <br />(1959) <br />Oct.1958 <br /> <br />169.905 <br /> <br />156. J..44 <br />12,631 <br /> <br />6,063 <br />8,311 <br />5'17 <br />708 <br />34,603 <br />1,051 <br /> <br />10,142 <br />15,977 <br />9,213 <br />806 <br />17,619 <br />25,323 <br />4,384 <br />1,523 <br />6,027 <br />1,046 <br /> <br />t'" <br />Principal reason for change --i <br />between 1957 and 1959 c' <br />f}~. <br /> <br />Feature added <br />Feature deleted <br />Price decline <br />Price decline <br />Change in design for power <br />Change in design for power <br />Price decline <br />Price decline <br />raletion--Ruedi substitution <br />Price increase <br />Price increase <br />Price increase <br />Price increase <br />Change in design for power <br />Price increase <br />Price increase <br />Price increase <br />Price increase <br />Price increase <br /> <br />Mm"..cipal water delivery system 2l.~0 13.291 13.761 <br />l\~'l~ansas Valley System 20,984 7, 863 8,276 Price increase <br />Colorado Springs System 516 5.428 5,485 Price increase <br />!/ Forebay not specifically identified but cost included in the power canal <br /> <br />