<br />Comparison of changes in plan and cost estimates
<br />(Thousands of dollars)
<br />
<br />Features
<br />
<br />Price index date
<br />Total project. cost
<br />
<br />0-
<br />
<br />Basic project features
<br />Ruedi Dam and Reservoir
<br />Aspen Dam and Reservoir
<br />Sugar Loaf. ram. and Reservoir
<br />Twin Lakes Dam and Reservoir
<br />Salida Forebay
<br />Sa2.ida Afterbay
<br />Pueblo Dam and Reservoir
<br />L'version works
<br />h-:nter Creek - Aspen Canal
<br />S;;i1th Side Collection System
<br />No::-th Side Collection System
<br />I',,"vingpan-Arkansas Divide Tunnel.
<br />~"0wden Canal
<br />Pc',rer canals
<br />:'''"erplants
<br />~,,':i tchyards
<br />~'"jstations
<br />?~ansmission lines
<br />( neral property
<br />
<br />H.D. 187
<br />(1953)
<br />
<br />Jan.1953
<br />
<br />172,898
<br />
<br />151.,398
<br />
<br />8,102
<br />7,248
<br />10,222
<br />a/
<br />-310
<br />43,453
<br />748
<br />240
<br />9,058
<br />21,55'1
<br />10,095
<br />587
<br />12,639
<br />14,917
<br />3,885
<br />2,091
<br />5,079
<br />1,173
<br />
<br />S. 60
<br />H.R. 594
<br />(1957)
<br />Oct.1956
<br />159,287
<br />145.996
<br />7,235
<br />6,615
<br />9,004
<br />Y
<br />362
<br />36,926
<br />1,143
<br />250
<br />10,070
<br />15,956
<br />9,107
<br />483
<br />12,848
<br />23,813
<br />4,150
<br />1,509
<br />5,511
<br />1,014
<br />
<br />Current
<br />plan
<br />(1959)
<br />Oct.1958
<br />
<br />169.905
<br />
<br />156. J..44
<br />12,631
<br />
<br />6,063
<br />8,311
<br />5'17
<br />708
<br />34,603
<br />1,051
<br />
<br />10,142
<br />15,977
<br />9,213
<br />806
<br />17,619
<br />25,323
<br />4,384
<br />1,523
<br />6,027
<br />1,046
<br />
<br />t'"
<br />Principal reason for change --i
<br />between 1957 and 1959 c'
<br />f}~.
<br />
<br />Feature added
<br />Feature deleted
<br />Price decline
<br />Price decline
<br />Change in design for power
<br />Change in design for power
<br />Price decline
<br />Price decline
<br />raletion--Ruedi substitution
<br />Price increase
<br />Price increase
<br />Price increase
<br />Price increase
<br />Change in design for power
<br />Price increase
<br />Price increase
<br />Price increase
<br />Price increase
<br />Price increase
<br />
<br />Mm"..cipal water delivery system 2l.~0 13.291 13.761
<br />l\~'l~ansas Valley System 20,984 7, 863 8,276 Price increase
<br />Colorado Springs System 516 5.428 5,485 Price increase
<br />!/ Forebay not specifically identified but cost included in the power canal
<br />
<br />
|