Laserfiche WebLink
<br />- - --- -- _______m____________ <br /> . .. . <br /> " <br /> " <br /> < <br /> SUKHARY OF SALVAGED AND SAVED WATER ,. <br /> POTENTIALLY AVAILABLE FROM UINTAH AND <br /> PRICE-SAN RAFAEL SALINITY CONTROL PROJECTS <br /> I . <br /> Irrigation Efficiency .Savec!- Water Saved Water Salvaged Water Reduction in COne. Salvage Reduction Change in River <br />, I Improvement Level_ Reclu.ction in Annua.l COat Uee ,J! Annual Coat Ret:urn Plow below <br /> Diverd.one Flow <br /> I h..dgate return <br /> flow entry <br /> U' ,J! $/U'/yr V Crop c.u.. Incid.c.u. Net c.u. , 11 $/U'/yr V U' AF <br /> UIIITAII BASIN <br /> c... II Improved - <br /> C... I Exletinq Sy.tara 6,310 8' $100 <6,820> 420 11 -- --- 12 710 + 6,310 -6,400 <br /> Ca.. III Improved (no <br /> additional crop cone. U8e) - <br /> Ca.e I 18,1'0 24' $ 35 0 2,005 2,005 3' $325 16,185 +18,190 +2,005 <br /> PRICE SAN RAFAEL <br /> Ca.. II Improved - 11 <br /> Case I Exlstina System 0 - -- <24.688> <621> -- --- 25,309 0 -25.30' <br /> C.ae III Improved (no <br /> additional crop cons. UBe) - <br /> Case I 48,350 2" $125 0 10,038 10,038 6' $595 38,312 +48,350 +10,038 <br /> 1/ Percent of pre-improvement diversion levels: Uintah at 74,960 AF/yr, Price-San Rafael at 178,100 AF/yr <br /> V Annual Project Costs from USDA/USBR Planning Documents <br /> Uintah Basin Construction Cost - $6.74 million, Annual Cost = $652,000 <br /> Price-San Rafael Construction Cost - $72.14 million, Annual Cost ~ $5,986,000 <br /> 11 Consumptive Use Increases because area has a current shortfall in irrigation water availability, no salvage results. <br />I: <br /> BJSALVAGE2.TAB <br />c <br />w. <br />, <br />, <br />, <br />i:""OJ ,',;,'",,(,,-,.. <br /> <br />;::::l <br />(.;':)- <br />~ <br /> <br />c.;:.' <br /> <br />-.J <br /> <br />8 <br />Do <br />0- <br />~ <br />m <br /> <br />'" <br />