Laserfiche WebLink
<br />-.z <br /> <br />Fed8nI lit - I Vol. "' No. IlO I Monday, Mty 9, 1983 1 Notices <br /> <br />- emciellC)' wltbln the CllD8traiDta <br />Nlmpoaed by Jaw, replatiOJl8, arrd <br />C""._u.. <br /> <br />C. Section B. Authoriti.. <br /> <br />CI': Federal power iD the Boulder City <br />Area it marketed in acr:onlurce wltIr the <br />C. power IIWkelbIa aulhorillea iD Federal <br />recI....1laa Ia_ (Act of Juno 17. 1102, <br />32 Stat. _.. aD acto amtIDdatory <br />tbereof. __entary thereto): the <br />Depa.- il Jlaeray Orsllllization Act <br />of 1lI'17 (lit Stat. 581i): and iD particular. <br />thOle acto arrd amendmenta enabq the <br />Boulder Canyon Project (05 Stal1057): <br />Parker-Davia Project (49 Stat. 1028. 1039; <br />68 Stat. 143): and the Colorado River <br />Basin Project (82 Stat. 885). <br /> <br />Section C. Controctuollnformation <br /> <br />Power contracta will be implemented ./ <br />as existing contrects and contract <br />extension. terminate, and as additional <br />re.ources become available. The <br />existing Boulder Canyon Project <br />contracta terminate on May 31. 11187. <br />The exi.ting Parker.Davis Project <br />contrecte terminate on March 31, 19116. <br />The Parker-Davi. Project contracto will <br />be extended tbroU8h May 31, 11187. upon <br />mutual agreement between Western and <br />each individual contractor, in order to <br />have common contract termination <br />dates, <br />The additional Parker-Davi. Project <br />power will not be ovailable until <br />operational integration in the Boulder <br />City area i. implemented. Navajo power <br />surplus to the needs of the Central <br />Arizona Project and Title I Salinity <br />Control Project (a. amended by Pub. L. <br />96-336. September 0, 1980, 88 Stal 288), <br />m.y be evailable a. early as July 198f. <br />iDollrYin8 quantities, and will be <br />markeleclilroa~rdance with these <br />Criteria. <br />Western will offer power contracta to <br />e.ch contractor contalnlns the tel1llll <br />and conditions and any opecial <br />provisions which may be applicable to <br />the power to be marketed under these <br />Criteria. Sep.rate exhibit. to the <br />contract. will identify ouch things as the <br />.mounts of capacity and enel'8Y to be <br />delivered on a monthly ba.ls from a <br />particular Project. the point(.) of <br />delivery. and the lIIlIXimum rate of <br />delivery at each poiDt of delivery, These <br />exhiblta will be prepared and modified <br />as neceuary, Ifrequeated by tire <br />contractor, Western. iD preparation of <br />the exhiblta. will endeavor to <br />.pproxlmate the individual contractor'. <br />....onal and monthly en.1'8Y ....1" <br />p.ttern. The extent to wblch Western <br />will be able to accommodate these <br />p.ttern., will be contingent upon . <br />monthly enel'8Y evailability and <br />required water releasea. <br /> <br />11Ie Projecta will be operationally <br />Irr.....ted to improve the afticiency of <br />the Federa1 ayatem in accordance with: <br />the operatiODAl constraiDta of the <br />Colorado River, bydro-pn>ject <br />JIOWWPIaDla, and Navajo Generating <br />StatiOll, as may be lmpoocd by tire <br />Secretary of the Interior or authorized <br />repretlentativaa: applicable JaWl; the <br />pneral terma, conditiona, and principle. <br />contained in the.. Critaria: and tire <br />General Power Contract Provi.iOlll iD <br />effect which are applicable to . <br />particular Project. <br />Lolli-term contracta for Parker-Davis <br />Project power will terminate September <br />30, 'JJX1T. Lo.....term contracte for Boulder <br />Canyon Project power will terminate on <br />September 30, 2.017, Lo.....term contracte <br />for the Boulder Canyon Project will be <br />subject to an enel'8Y revision on or <br />about October 1, 'JJX1T, if deemed <br />necellary by Western. due to the result. <br />of then cummt bydrolosy .tudie., <br />Each Boulder Canyon Project and <br />Navajo contractor will aIIo <br />contractuaJJy agree to supply ite own <br />reserves for power from these ""'lecta <br />which meet or exceed Western Systems <br />Coordinating Counell minimum reserve <br />requiremente. <br />Contracte for Boulder Canyon Project <br />power will allow for a reducllon iD <br />cap.city due to senerating unit outqe. <br />caused by forced outages, m.int8lUlDce <br />schedule., or reservior drawdown, Thi. <br />reducllon will be based on the ratio <br />each entity'. allocation ofBouldar <br />Canyon Project capacity baan to the <br />total Boulder Canyon Project capacity <br />marketed. multiplied by the amount of <br />capacity removed from .ervice, or not <br />available because of reducllon in <br />effective bead, <br />Nolwithet.ndiBa lbe procedures in <br />Section A of Part vm. below, We.tem. <br />within the constrainta of river operation. <br />iDtendc to permit each Boulder Canyon <br />Project power contractor to .chedule <br />loaded and unloaded .ynchronized <br />I18ner.tion. the IUDI of wblch cannot <br />exceed the amount of capacity reserved <br />for the renewal offer to the iDdividual <br />contractofl, To the extent that enel'8Y <br />antitlementa are not exceeded. such <br />pre\'ioualy ocheduled unloaded <br />.ynchronlzed pneration may be used <br />for resuJetiOll, ramplna. and splnnins <br />reoerves tbrousb the use of a dynamic <br />.fsnaJ. Theoe functiona will be <br />developed by Western and Reclamation. <br />in cooperation with tire Boulder Canyon <br />Project power contractors. and <br />implemented by contract and tbroU8h <br />written operating lnstnrctiOJJll, <br />Enel'8Y used for the purpooe of <br />supplylna unloaded synchronized <br />pneration to Boulder Canyon Project <br />power contractofl will be accounted for <br /> <br />on a monthly ba.ia, and will be .upplied <br />by the individual contractOfl tbroush <br />reductionl iD en81'8Y deliverieo, in <br />.uboequent monthe. as will be specified <br />in the power CODtracto, <br />Studies are iD JIIOIIIU. to detenolne <br />tire pouible beneflta to lbe Central <br />Arizona Project of combiDed marketill8 <br />of the Navajo IUOUI'C8 and the Boulder <br />Canyon Project power allocated for use <br />within Arizona, and to determine the <br />amount of fundiDs that could feasibly be <br />provided to the Bureau of Reclamation <br />(Reclamation) by entities in the state of <br />Arizona or political subdivialons of the <br />State of Arizona, for lbe constnrction of <br />a resuJatory .tor. unit or other <br />features of the Central Arizon. Project. <br />The resulta of these .tudies and the teno <br />of iDdebtedness of any contributed <br />fundiDs arrllll8emente that m.y result <br />will have an effect upon the term of <br />power contracte for the Navajo <br />re.ouree. Therefore, Western will delay <br />eetabliabment of. term of contr.ct for <br />lOlli-term commitment. for Navajo <br />power until the.e atudie. are completed, <br />Weetem will purchase enel'8Y,lf <br />necel.ary, .pecifically for the purpose of <br />fuIfiIlins the enel'8Y oblisation. .bown in <br />theoe Criteria for the Boulder Canyon <br />Project and Parker-Davis Project: except <br />lb.t for thooe Boulder Canyon Project <br />contractofl that can provide !inning <br />enel'8Y more emciently from their own <br />resource., Western, on an ennual b..il, <br />will agree to thole contractofl providill8 <br />their own !inning enel'8Y. Weltern will <br />reduce the enel'8Y oblisation to thole <br />contractofl proportion.tely. The COlt of <br />!inning enel'8Y th.t is provided will be <br />reimbursed in the y.ar in which it <br />occun. <br />The individual Projects will rem.in <br />financially .earesated for the purpoles <br />of accounting and Project rep.yment. <br />The Boulder City Area r.te schedules <br />for each individual Project will be <br />developed to satisfy COlt recovery <br />criteria for e.ch Project. Cost recovery <br />criteria for the Boulder Canyon Project <br />and for the United State. N.v.jo <br />entitlement will be developed as p.rt of <br />a oeparate public process. The P.rk....- <br />D.vi. Project cost recovery criteria ik <br />already eltablilhed: <br />In seneral, the co.t recovery criteria <br />will include componentl such as <br />operation and maintenance, <br />replacementa, bettermenta, amortiz.tion <br />of lo.....term debt with interest. and <br />other financial obligations of the <br />Projecte. IIesInnln8 June 1, 1987, the rate <br />for Boulder Canyon Project power will <br />include a component to provide for a <br />contribution to the Lower Color.do <br />River Basin Development Fund, in <br />accordance with the Colorado River <br />