Laserfiche WebLink
<br />27 <br /> <br />~~ <br />~ <br />~ <br />N <br /> <br />Sprinkler - 0.4 ac ft/ac x 4.2 tons/ac ft = 1.68 tons/acre <br />Surface 0.2 ac ft/ac x 4.2 tons/ac ft = .84 tons/acre <br />The salt load reduction from installing improved systems and <br />better management for the McElmo Creek unit is: <br /> <br />Sprinkler <br />Surface <br />Salt load <br /> <br />- 19,700 ac <br />1,850 ac <br />Reduction - <br /> <br />x 1.68 tons/acre = <br />x 0.84 tons/acre = <br />Improved .ystems = <br /> <br />33,100 <br />1.500 <br />34,600 <br /> <br />tons/year <br />tons/vear <br />tons/year <br /> <br />SEEPAGE REDUCTION: <br /> <br />Onfarm earthen ditch seepage loss calculations are necessary to <br />compute a salt load reduction due to lining or piping (Refer to <br />the FIRI manual distributed by Engr, WNTC, 1991, for procedure). <br /> <br />Assume silt and clay loam soils with a seepage rate of 0.6 cfd ; <br />flow of 1 to 5 cfs; time flow in the ditch for 3 to 5 irrigations <br />is 45 days; and the wetted perimeter of the ditch is 4 square <br />feet per linear foot. <br /> <br />Seepage from earthen onfarm ditches = <br />0.6 cfd x 1 AF/43,560 cf x 4 sq ft/lin ft x 45 days x 5280 ft <br />Seepage = 13.1 acre feet/mile/year. <br /> <br />Assume that 20 \ of the potential seepage is consumed by wetland <br />vegetation and doesn't return to the river. Use by 4,000 acres <br />of wetland habitat mapped during planning would reduce return <br />flow about 6,000 ac ft or 20 percent. About 80\ of the seepage <br />would return to McElmo Creek. <br />13.1 x 0.8 = 10.5 ac ft/mi/yr. <br /> <br />Seepage reduction due to lining or p~p~ng earthen ditches: <br />10.5 ac ft/mile/year or 0.2 ae ft/100 feet <br /> <br />Salt load reduction due to lining or piping earthen onfarm <br />ditches and small laterals: Assume 4.2 tons salt lac ft <br /> <br />10.5 ac ft/mi/yr x 4.2 tns/ac ft = 44 tons salt per mile/year <br />Salt load reduction - lining/pipe 0.83 tons salt/100 ft/year <br /> <br />268 miles of lining or pipe x 44 tons/mile = 11,800 tons/year <br /> <br />The impact of substituting pipeline for an additional 335 miles <br />of field earth ditches when installing sprinklers is included <br />with unit reduction per acre in deep percolation due to <br />installation of sprinkler systems. <br />