Laserfiche WebLink
<br />TABLES <br /> <br />BUREAU OF RECLAEATION REPORT <br /> <br />Weather Records at Representative Stations, " , ,. , , . , . . , <br />Assessed Valuation of All Taxable Properties in Utah and in <br />Principal Counties of Central Utah Project Area--194S. . . . , <br />Major Features in Uinta Basin--Comprehensive Development . . . . <br />Major Features in Bonneville Basin--Comprehensive Development. .. <br />Official Estimate of Total Project Cost. . . , . , , . . . . . . <br />Annual Costs of Irrigation, Power and Municipal Water Features. <br />Annual Costs of Recreational Features. . . . . . . . . . . .. . , <br />Average Annual Flows Divertible to Strawberry Reservoir--Com- <br />prehensive Development . . . . . . . . . . . , . . . . . . . . <br />Average Annual Use of Project Water, Bonneville Basin--Com- <br /> <br />prehensi ve Development . . '" . . . . . , . . . . . . . . . . <br />Irrigation and Municipal Requirements and Supplies in Uinta <br />Basin--Comprehensive Development , . . . . . , . . . . . . . . <br />Estimated Gross ilater Supply Available at Potential Points of <br />Diversion to Strawberry Reservoir--Initial Phase . , , ., . . <br />Period of Record and Mean Annual Run-off at Gaging Stations on <br />Uinta Basin Streams. . . . . . . . . . . . . . . . . . .. . <br />Irrigation Diversions Required for Initial Phase . , . , . . . . <br />Return Flow From Water Supplied by the Project--Initial Phase, . <br />Estimated Reservoir Evaporation Losses--Initial Phase. , , . , , <br />Municipal and Industrial Water Requirements--Initial Phase , . , <br />Average Annual Flows Divertible to Strawberry Reservoir--Initial <br /> <br />Phase . . . . . . . . . . . . . . . . . . . . . , . . . . . . <br />Water Available to Strawberry Reservoir--Initial Phase . . . . . <br />Average Annual Use of Project Water, Bonneville Basin--Initial <br /> <br />Phase .. . . . . . . . . . . . . . . . . . . . . . . . . .. .. <br />Average Annual Use of Project Water, Provo River Exchange-- <br /> <br />1ni tial Phase. . . . . . . eo , . . . . . . . . . . . . . . . .. <br />Average Annual Distribution of Water in Uinta Basin--Initial <br /> <br />Phase .. . .. . . . . . . . . . . . . . .. . . . .. . . . . <br />Summary of Reservoir Operation Study,-Oaks park and Stanaker <br />Reservoirs--Initial Phase, , . . . . .. .,.. . , <br />Tyzack Reservoir Operation--Initial Phase. . . . . . . . . , , , <br />Municipal Supply and Requirements--Salt Lake County, . . . ., . <br />Present t'funioiplU Supply and ii.nticipa~ed Requirements--UW1 Comty <br />Anticipated Annual Municipal and Industrial Water Requirements <br />In Excess of Present Supplies. . . . . . . . . . . . , . , . . <br />Present Generating Capacity (December 1950). .. . . . . . , , . <br />Past and Estimated Future Power and Energy Requirements~-Central <br />Utah Proje ct Power !1arket Area . . . . . . . . . , , , . <br />Summary of Power Production--Initial Phase . . . . . . <br />Estimated Losses in Production at Existing Plants. <br /> <br />. . . . <br /> <br />xi <br /> <br />Pap:e <br /> <br />3 <br /> <br />11 <br />27 <br />29 <br />44 <br />56 <br />60 <br />63 <br />64 <br />65 <br />66 <br />67 <br />68 <br />70 <br />71 <br />72 <br />76 <br />77 <br /> <br />80 <br /> <br />81 <br /> <br />, <br /> <br />86 <br /> <br />91 <br />92 <br />94 <br />96 <br />99 <br />102 <br /> <br />104 <br />113 <br />116 <br />