Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />As discussed at the last Board meeting. the House and the <br />Senate had each conditioned the appropriation for the project on <br />the execution of a contract between non-federal entities and the <br />Secretary of the Interior providing for cost-sharing for the <br />project. The report language ultimately agreed to by the House <br />and Senate conferees is attached for your information. this <br />condition having been preserved by the conference committee. <br /> <br />South Platte Channelization Project <br /> <br />l--'- <br /> <br />At the July Board meeting. I indicated that an issue had <br />arisen with respect to the potential extension of Ken Caryl Road <br />across the Littleton floodplain park. which park encompasses the <br />first stretch of river immediately below Chatfield Dam. This <br />reach will not be channelized because the surrounding lands will <br />be preserved in an undeveloped condition. The enclosed letter <br />from me to the District Engineer. Omaha District. Corps of <br />Engineers, sets forth the matters which I feel need to be <br />addressed before a decision is reached on the possible extension <br />of this road. As of the date of this memo. the City of Littleton <br />has not put forth its formal proposal for the road extension. <br /> <br />JWM/gl <br /> <br />Enclosures: as stated <br /> <br />d page(s) of enclosure <br />follow <br /> <br />MEMORANDUM <br /> <br />-2- <br /> <br />August 28. 1985 <br />