My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04506
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:46 PM
Creation date
10/12/2006 12:24:05 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.100.60
Description
Colorado River Basin Salinity Control Forum
Basin
Colorado Mainstem
Water Division
5
Date
5/1/1987
Author
CRBSCF
Title
Proposed Report on the 1987 Review - Water Quality Standards for Salinity - Colorado River System
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />w <br />en <br />IV <br />i-" <br /> <br />be~n developed to evaluate investment levels. The purpose <br />is to minimize cost, meet the salinity reduction <br />requirements and minimize interest payments from the Lower <br />Colorado River Basin Development Fund. <br />Revenues in the Lower Basin fund are derived from a 2 <br />1/2 mill levy on hydropower generation in the Lower Basin. <br />The plan of implementation presented in this report <br />incorporates a construction schedule that when implemented <br />would have an estimated cost of $560 million. ' Under this <br />plan, the required salinity reduction can be made to the <br />year 2010, and the Lower Basin_ fund will be adequate to <br />meet its obligation of repayment if the annual inflation <br />rate does not exceed 3.7 percent. <br /> <br />Responsibility for AccomplishinR <br />Salinity Control Measures <br /> <br />The plan of implementation recognizes that the Forum, <br />the sev~ral federal agencies, and the Basin states each <br />have specific responsibilities for furthering the salinity <br />control program. Table 5 presents, in summary form, the <br />elements of the plan of implementation. which considers <br />full implementation of all salinity control measures <br />discussed in Chapters IV and V. <br />The table includes actions to be taken, the time <br />schedule, and the responsible entities. <br />The Forum will provide overall coordination and a <br />continuing review of salinity changes and program <br />effectiveness. Every 3 years, or more often if necessary, <br />the Forum, in light of existing depletions and salt <br />concentrations, will consider and, where needed and <br />feasible, recommend revisions in the schedule for <br />installing salinity control measures and/or modifications <br />of th~ numeric criteria. The review will include both <br />fed~ral and non-federal programs. <br />Appropriate fed~ral agencies will complete planning <br />reports and seek authorization and funding for salinity <br />control in accordanc~ with Title II of Public Law 93-320 <br />and Public Law 98-569. The Basin states will lend their <br />support to requests for authorization and funding. <br /> <br />-63- <br />
The URL can be used to link to this page
Your browser does not support the video tag.