Laserfiche WebLink
<br />co <br />In <br />C\J <br />c-' <br /> <br />,,~" <br /> <br />CHAPTER I <br /> <br />INTRODUCTION <br /> <br />The SCS is lining some off-farm laterals incorporating sizing <br /> <br />criteria which was established and agreed to by the two agencies. The <br /> <br />supplement provides that the SCS will plan and arrange needed improve- <br /> <br />ments as resources become available on laterals. Highest priority would <br /> <br />be given to laterals that affect on-farm improvement measures. <br /> <br />The SCS developed a monitoring and evaluation plan for the Grand <br /> <br />Valley Unit in January 1983, recognizing that measuring salt load reduc- <br /> <br />tion is an important and necessary element of the on-farm portion of the <br /> <br />Colorado River Basin Salinity Control Project. Also of equal importance <br /> <br />is the need to determine what changes, if any, occur in wet land and <br /> <br />wildlife habitat due to implementation of salinity control measures. <br /> <br />5 <br />