My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04473
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04473
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:38 PM
Creation date
10/12/2006 12:22:47 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee - AWRBIAC -- Reports
Basin
Arkansas
Water Division
2
Date
6/1/1955
Title
Arkansas-White-Red River Basins - Part II - Section 14 - Mapping
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />o <br />f\:) <br />~ <br />.... <br />0') <br /> <br />SYLLABUS <br /> <br />1. This section of the AWR Report contains a plan for com- <br />pleting topographic maps of the area, including .basic control surveys. <br /> <br />2. The AWR basins, as subdivided for mapping purposes, <br />include all or parts of 1,268 fifteen-minute quadrangles. Approx- <br />imately 32 per cent of the area is covered by published maps or <br />currently active proj~cts, leaving 864 quadrangles to be mapped for <br />complete coverage. The expressions of need for new mapping have <br />been translated into a priority sequence within a 20-year program, <br />which is estimated to cost about 19 million dollars. Priorities <br />for completing basic control surveys were coordinated with the need <br />, <br />for these data in the preparation of the new maps, with the cost of <br />this program estimated at 4.5 million dollars. The cost estimates <br />are based on records of 1949 costs. The 20-year programa for com- <br />pleting the mapping and basic control surveys have been subdivided <br />into a 6-year (Category I) unit and the remainder. . Although the <br />resultant schedule calls for two thirds of the 20-year program to <br />be accomplished within the first six years, it. reflects the urgency <br />of the coordinated requests and has been.restricted within the <br />limits of realistic accomplishment. <br /> <br />3. It is recommended that the plans presented herein for <br />the preparation of topographic maps and execution of basic control <br />surveys be adopted as a framework from which the responsible agen- <br />cies should schedule their operations in the AWR area. <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />i I <br />, <br /> <br />v <br />
The URL can be used to link to this page
Your browser does not support the video tag.