My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04473
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04473
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:38 PM
Creation date
10/12/2006 12:22:47 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee - AWRBIAC -- Reports
Basin
Arkansas
Water Division
2
Date
6/1/1955
Title
Arkansas-White-Red River Basins - Part II - Section 14 - Mapping
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />o <br />~. <br /><:0::. <br />I!"*- <br />~ <br /> <br />TABLE OF CONTmTS <br /> <br />Topic Title <br /> <br />Pa/l:e No. <br /> <br />CONTENTS <br />PREFACE <br />SYLLABUS <br />SCOPE <br />DESCRIPTION AND STATUS <br />Aerial PhotoRraphy <br />Control <br />First- and Second-Order Control Surveys <br />Third...{lrder Control Surveys <br />State Plane Coordinate Systems <br />Supplemental or Photo Control <br />TOJlORraphic QuadranRle MappinR <br />Publication Scales - Contour Intervals <br />Compilation Method <br />Status of Topographic Mapping <br />NEEDS FOR TOPOGRAPHIC MAPS <br />mE PLAN <br />Control <br />Aerial PhotoRraphy <br />TOllORraphic MappinR <br />Costs <br />CONCLUSIONS AND RElmMMENDATIONS <br /> <br />i <br />ii <br />v <br />1 <br />2 <br />2 <br />4 <br />4 <br />6 <br />8 <br />8 <br />9 <br />10 <br />11 <br />11 <br />14 <br />17 <br />17 <br />18 <br />18 <br />21 <br />25 <br /> <br />Tables <br /> <br />Table <br /> <br />Title <br /> <br />PaRe No. <br /> <br />1 Costs: Horizontal Control (First- and Second...{lrder) 22 <br />2 Costs: Vertical Control (First- and Second...{lrder) 23 <br />3 Costs: Topographic Map Compilation (including <br />third-order basic control and aerial photography) 24 <br /> <br />Illustrations <br /> <br />Plate No. <br /> <br />Title <br /> <br />Between <br />PaRes <br /> <br />1 <br />2 <br />3 <br /> <br />17 and 18 <br />17 and 18 <br />20 and 21 <br /> <br />Basic Horizontal Control Plan <br />Basic Vertical Control Plan <br />Topographic Mapping Plan <br /> <br />iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.