Laserfiche WebLink
<br /> 6.20 Summary of Screening 6-54 <br /> 7.1 Alternative Pumped-Storage Sites 7-6 <br /> 7.2 Preliminary Cost Estimate Needle Point No. 3 7-9 <br /> Pumped-Storage Project <br />0 7.3 Preliminary Cost Estimate Rocky Point 7-10 <br />(" ~ \ Pumped-StDrage Project <br />~ 8.1 Central Colorado PrDject ' 8-7 <br />(':) 8.2 Central Colorado Project Preliminary Cost Estimate 8-8 <br />CJ1 8.3 Central Colorado Project Description 8-9 <br />Ul 8.4 Central Colorado Project Preliminary Cost Estimate 8-10 <br /> 8.5 Collegiate Range Project 8-13 <br /> 8.6 Collegiate Range Project Preliminary Cost Estimate 8-14 <br /> 8.7 Union Park Water Supply Project 8-17 <br /> 8.8 'Union Park Project Preliminary Cost Estimate 8-18 <br /> 8.9 Taylor Park Project 8-20 <br /> 8.10 ' Taylor Park Project Preliminary Cost Estimate 8-21 <br /> 8.11 Summary of Taylor Park Project and Variations 8-25 <br /> 8.12 Unit Cost of Project Yield 8-32 <br /> 9.1 Components Recommended for Consideration in Plan 9-6 <br /> Formulation <br /> 9.2 Components Included in No-Action Alternative 9-7 <br /> Which Do Not Presently Exist <br /> 9.3 Definition of Alternative No. 1 9-8 <br /> 9.4 Definition of Alternative No. 2 9-10 <br /> 9.5 Definition of Alternative No. 4 9-11 <br /> 10.1 Upper Gunnison Project Water Rights Used for In-Basin 10-4 <br /> Reservoirs <br /> 10.2 Ohio Creek at Mouth 10-7 <br /> 10.3 Tomichi Creek AbDve Razor Creek 10-8 <br /> 10.4 CochetDpa Creek Above lDS Pinos Creek 10-9 <br /> 10.5 Instream Flow Regimes Considered 10-15 <br /> 10.6 Summary of Results, Scenario 8 10-16 <br /> 10.7 Scenario 8 Results - Exports From Taylor Reservoir 10-18 <br /> 10.8 Scenario 8 Results - Taylor River Below Taylor Reservoir 10-19 <br /> 10.9 Scenario 8 Results - Black Canyon, Average Monthly Flow 10-21 <br /> 10.10 Scenario 8 Results - Blue Mesa Releases for <br /> Black Canyon Instream Flow 10-22 <br /> 10.11 Scenario 8 Results - Gunnison Tunnel Diversions 10-23 <br /> 10.12 Summary of Results - Scenario 11 10-26 <br /> 10.13 Scenario 11 Results - Exports from Taylor Reservoir 10-27 <br /> 10.14 Scenario 11 Results - Taylor River Below Taylor Park Dam <br /> Average MDnthly F1DW 10-28 <br /> 10.15 Scenario 11 Results - Taylor Park Reservoir Contents 10-29 <br /> 10.16 Summary of Export Scenarios Using New Water Rights 10-32 <br /> 11.1 Preliminary Cost Estimate - Alternative No.1 11-2 <br /> 11.2 Preliminary Cost Estimate - Alternative No.2 11-3 <br /> 11.3 Preliminary Cost Estimate - Alternative No.3 11-,4 <br /> 11.4 Preliminary CDSt Estimate - Alternative No.4 11-5 <br /> 11.5 Preliminary Cost Estimate - Alternative No.5 11-6 <br /> 11.6 Preliminary Cost Estimate - Alternative No.6 11-7 <br /> 11.7 Alternative Plan ComparisDn Table 11-9 <br /> 11.8 Taylor Park Project, Project Features 11-16 , <br /> ." " <br />