Laserfiche WebLink
<br />o <br />_..~"") <br />~ <br />(:;) <br />IA. <br />c:n <br /> <br />Project <br /> <br />Central Colorado Project <br />Central Colorado Project <br />Collegiate Range Project <br />Union Park Project <br />Union Park Project <br />Taylor Park Project <br />Taylor Park Project Variation <br /> <br />TABLE 5.9 <br />Unit Cost of Project Yield <br /> <br />Average <br />Annual Yield <br />(af/yr) <br /> <br />Unit Costl <br />(N/af) <br /> <br />Annualized <br />Unit Costl <br />($/af/yr) <br /> <br />753 <br />425 <br />752 <br />1,292 <br />733 <br />718 <br />621 <br /> <br />1. Based on Total Investment Cost. <br />2. Source: Fleming, David E., Colleaiate Ranae Proiect, 1985. <br />3. Range of yield depending on integration with the Denver Water Department <br />system. Source: U.S. Corps of Engineers, Metropol itan Denver Water <br />Supply EIS, Volume VIII, 1988. <br />4. Variation consists of pumping 58,000 af per year from Blue Mesa Reservoir <br />to Taylor Park Resevoir <br /> <br />60,000 <br />150,000 <br />73,1002 <br />63,0003 <br />111,0003 <br />42,000 <br />100,0004 <br /> <br />6,830 <br />3,310 <br />7,810 <br />12,760 <br />7,240 <br />7,207 <br />5,148 <br /> <br />S-20 <br />