Laserfiche WebLink
<br />NEED FOR WATER DELIVERIES <br /> <br />Current water demand projections for the Wasatch Front indicate a need J9. <br />have JOlnt use water conveyance facilities in place to deliver Bonneville :t' <br />Unit water from Strawberry Reservoir by 1992, and no 1 ater than 1996. The <br />Di iI110nd Fork Power System must be constructed now since water del iveries <br />honoring existing contracts must be made within this timeframe and con- <br />struction of the systems must be concurrent. <br /> <br />Project Status <br /> <br />Feasibility designs have been completed for all of the major features <br />of the Diamond Fork Power System. Geologic and other design data <br />investigations for final design of the project facilities are currently <br />underway. <br /> <br />A draft environmental statement for the Di amond Fork Power System facil i- <br />ties was published in June 1983 and attendant public hearings were held. <br />The final environmental statement will most 1 ikely be filed with the EPA <br />during the summer of 1984. Environmental studies are currently underway on <br />the additional grid transmission facilities that will be required to <br />d!Stth~ibUthte Diaf!lontd Fork power. ~o endangered species have been identified .)(( <br />Wl ln e proJec area.. <br /> <br />Recl iI11ation expects to obtain an exemption to section 404 of the Clean <br />Water Act WhlCh wlll ellmlnate the need for dredge and fill permits. ..v <br />We anticipate that FERC license will not be required since the project 71 <br />authorization by ConQress included development of power as a project pur-- <br />pose of the Central Utah Project, <br /> <br />An access road into the Fifth Water Pumped Storage Powerpl ant site is <br />currently under construction and scheduled for completion in the summer <br />of 1984. This road will provide construction access for an exploratory <br />shaft into the underground powerpl ant cavern area. Specifications for the <br />exploratory shaft, which will provide data to move to final design are <br />currently being prepared. <br /> <br />Design and Construction Schedule <br /> <br />The desiQn and construction schedule shown in Figure 15 for the Diamond <br />Fork Power System has been prepared with a tarQet pl ant-on-line date <br />of 1992. This schedule shows construction of the major facilities <br />beginning in 1986 and completion of construction in 1993. If necessary, <br />the schedule coul~ be adjusted to del ay the power-on-line date until 1996; <br />however, initial water delivery is scheduled for 1992. <br /> <br />22 <br />