My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04432
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04432
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:27 PM
Creation date
10/12/2006 12:19:28 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.760
Description
Yampa General Publications - Correspondence - Reports
State
CO
Basin
Statewide
Date
7/1/2003
Author
Mary H Peterson
Title
Schedule of Proposed Actions - Medicine Bow-Routt National Forests - Thunder Basin National Grassland - Third Quarter - July through September 2003
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,-,'.'" .. <br /> <br />002~23 <br /> <br />Schedule of Proposed Actions (SOPAl - Medicine Bow-Routt National Forests <br />7/2/2003 <br /> <br /> ProJeeI Name District EstJActual Scoplng Date Expected NEPA Document <br /> Rochelle Hills Slide Road Relocation Douglas February, 2000 EA <br /> Project Type Contact EstJActual Decision Date ProJect Status <br /> Travel Management Troy Palmer; 307-358-4690; tpalmer@fs.fad,us See Remarks On Hold - Other <br /> Remarks/Description Location <br /> Relocate damaged road. The funding to continue the planning and analysis of this proposed project is not available in T,41N., R.68,69W, <br /> FY~003. As soon as funding is allocated, the planning for this project will resume. <br /> Project Name District EstJActual Scoplng Date Expected NEPA Document <br /> Box Elder Road Use Permit Douglas Indeterminate CE <br /> Project Type Contact EstJActual Decision Date Project StatuI <br /> Watershed Management Misty Hays;307-358-4890;mhays@fs.led.us Indeterminate Prescoping <br /> RemarkslOescrlptlon Location <br /> Louisiana-Pacific Corporation road use permit application tor a shorHerm, 8 month, permit to haul an estimated 350 MBF T,33N,R.78W.. sections 12.14, <br /> 01 pine sawlogs from Wyoming State School Trust lands over FSR #629, the Box Elder Road. Further preliminary study 01 22-23,27 and 35 <br /> this proposal is ongoing and the original proposed action is likely to change before the proposal Is scoped with the public. <br /> Project Name District EsUActual Scoplng Date Expected NEPA Document <br /> Hensel Fire-Wildlile Habitat Restoration Douglas July 2003 ce <br /> Project Type Contact EsUActual Decision Date Project Statu. <br /> Wildlife Management Tim Byer, 307-358-4890 August 2003 Prescoping <br />. RemarkslOescrlptlon Location <br /> Ae-seeding of Hensel Fire with a mix of native grasses. Made up of Idaho fescue, Blue-Bunch wheatgrass end westem North Side of laramie Peak <br /> wheatgrass and it feasible bitterbrush. Within the riparian area tufted hairgrass will be used. Seed dispersal may involve and AShenfetder Basin <br /> the use of helicopter, hand crews of combination of both. This cx:curs in the laramie Peak Roadless area. No roads are <br /> expected to be built. The project is to establish important forage lor wildlife. <br /> Project Name District EstJActual Seoplng Date Expected NEPA Document <br /> Fuel Reduction Hahns Peak/Bears Ears '0/2003 EA <br /> Project Type Contact EstJActual Decision Date Prolect Status <br /> Fuels Management Kent Foster;970-S70-2142;kfoster@fs.fed.us 10/2004 On Hold - Other <br /> Remarks/Description Location <br /> Fuels reduction in wildland urban interlace using a combination of mechanical and prescribed burning treatments to reduce Steamboat lake;Seedhouse; <br /> natural fuel loading. Projects may include removal of fuels, II viable Wilderness Ranch-northwest 0 <br /> Bears Ears. <br /> Project Name District EsUActual Scoplng Date Expected NEPA Document <br /> Bark Beetle Management Hahns Peak/Bears Ears 1211999 EIS <br /> Project Type Contact EstJActual Declalon Date ProJect Statu. <br /> Integrated Pest Mgt, Andy Cadenhead;(970)870-2220; ecedenhead@fs.fed,us 8/8/2002 On Hold - Other <br /> Remarks/Description Location <br /> Entering Into lormal consultation with the U.S. Fish and Wildlife Service to prepare for additional Record of Decision. Hahns Peak/Bears Ears <br /> Ranger District and B portion 0 <br /> the Parks Ranger District. <br /> FEIS 'S completed, <br /> <br />Wedneroay, July 02, 2003 <br /> <br />Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.