My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04432
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04432
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:27 PM
Creation date
10/12/2006 12:19:28 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.760
Description
Yampa General Publications - Correspondence - Reports
State
CO
Basin
Statewide
Date
7/1/2003
Author
Mary H Peterson
Title
Schedule of Proposed Actions - Medicine Bow-Routt National Forests - Thunder Basin National Grassland - Third Quarter - July through September 2003
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OO~~1~ <br /> <br />Schedule of Proposed Actions (SO PAl - Medicine Bow-Routt National Forests <br />711/2003 <br /> <br />" <br /> <br />ProJect Name <br />Papa's Land Trust Spring & Road SUP Renewal <br />Project Type Contact <br />Lands Managament Joa Raddlck;307-358-4690;jreddick@fs,fed.us <br /> <br />Dlatrlct <br />Douglas <br /> <br />-Remarks/Description <br />The Renewal of 8n existing SUP that authorizes a spring and waterline development and <br />8 cabin on private land. This action has been pending for an extended period of time. <br /> <br />Project Name District <br />Abandoned Mine Land Reclamation 120 Groups 3 & 6 Douglas <br />Project Type Contact <br />Lands Management JoAnne Homuth; jhomuth@fs.fed.us; 307~358-4690 <br /> <br />EstJActual Scoplng Date <br />Indelanninate <br />EstJActual Decision Date <br />Indeterminate <br /> <br />access road across NFS land to <br /> <br />EstJActual Scoplng Date <br />March 28, 2003 <br /> <br />EstJActual Decision 08te <br />Fall, 2003 <br /> <br />Remarks/Descrlptlon <br />Abandoned bentonite mine land reclamation project at five (5) sites. Project administered by the Wyoming DEQ and the <br />Federal Office of Surlace Mining. The Forest Service Is a cooperating agency. <br />DAD Lands and Minerals project tracking ## 2800-03-008. <br /> <br />District <br />Douglas <br /> <br />Project Name <br />Roughrider Pipeline ROW SUP Renewal <br />ProJect Type Contact <br />lands Management Leonard Carter; 307-358--4690; lcarter@ts.ted.us <br /> <br />EstJActual Scoplng Date <br />Fabruary, 2003 <br />EstJActual Decision Date <br />Summer, 2003 <br /> <br />RemarksIDescrlptlon <br />The renewal of the special use pannit for a 4-inch buried high pressure natural gas pipeline across approximately four (4) <br />miles of the TBNG in Weston County, WY. The Lands and Minerals project tracking no. for this project is # 2700-03-014. <br /> <br />District <br />Douglas <br /> <br />ProJect Name <br />Laramie Peak Distribution Line SUP Renewal <br />Project Type Contact <br />lands Management Leo Carter; 307-358-4690; Icarter@fs.fed.us <br /> <br />- --EstJActual.Scoplng Date <br />Summer, 2003 <br /> <br />EstJActual Decision Date <br />Summer, 2003 <br /> <br />RemarkslDescrlptlon <br />A application by J&L Leasing to renew the special use permit for 8 2.4 mile, 2400 volt distribution powerline that serves the <br />regional communications site on Laramie Peak. The ROW is and would continue to be 30-fget wide involving 8.8 acrBS of <br />NFS land, <br /> <br />District <br />Douglas <br /> <br />ProJect Name <br />Yates Petroleum - Duck Cr. Fed. #1 APD <br />Project Type contact <br />Minerals Management Liz Moncrief, 307-745-2456;emoncrie@fs.fed.us <br /> <br />EstJActual Scoplng Date <br />February, 2002 <br />EstJActual Decision Date <br />Fall,2003 <br /> <br />RemarkslDescrlptlon <br />A proposal (APD) to drill an exploratory oil well The well would be drilled and developed in an Inventoried roadless area. <br />M EIS is being prepared. An NOI was published and public seoping began during earty 2002. <br /> <br />Expected NEPA Document <br />CE <br />Project Status <br />Prescoping <br /> <br />Location <br />T,27N,R.71W" section 28 <br /> <br />Expected NEPA Document <br />EA <br />Project Status <br />Analysis in Progress <br /> <br />Location <br />T,47N,R.64W" section 19 <br />T,47N,R.65W" sections 3 and <br />'2 <br />T,48N,R.84W" section 7 <br /> <br />Expected NEPA Document <br />CE <br />Project Status <br />Analysis In Progress <br /> <br />Location <br />T.41N.R.66W., section 6 <br />T.41N,R.67W., sections 2, 9, <br />'1 and'8 ' <br />T,42N,R.66W" section 32 <br /> <br />---Expected,NEPA Document <br />CE <br />Project Status <br />Prescoplng <br /> <br />Location <br />T.26N,R.72W" section 1-2 end <br />35-36 <br /> <br />Expected NEPA Document <br />EIS <br />Project Status <br />Analysis In Progress <br /> <br />Location <br />T.55N"R.69W" section 30 <br /> <br />Wednesday, July 02,2003 <br /> <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.