My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04428
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04428
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:26 PM
Creation date
10/12/2006 12:19:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP
Basin
Colorado Mainstem
Date
3/1/1988
Author
WAPA
Title
Replacement Resources Processes - Final Methods Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />March 1998 <br /> <br />Western Area Power Administration <br /> <br />1-3 <br /> <br /> <br />Section 1 <br /> <br />Introduction <br /> <br />Near the end of Phase I, Western retained the engineering-consulting firm RW. Beck to <br />provide assistance with specific aspects of the Replacement Resources Process. R W. <br />Beck was engaged to provide services during the remainder of Phase I and continuing into <br />Phase 2, beginning with attendance at the public meetings in November 1994, <br />R.W. Beck's principal focus was to assist Western with identifying economically and <br />technically feasible methods for replacing lost GCD power and preparing the Methods <br />Report in Phase 2 of the Replacement Resources Process,' <br /> <br />Table I-I summarizes the significant public consultation milestones in Phase I of the <br />Replacement Resources Process. <br /> <br />TABLE 1-1 <br /> <br />REPLACEMENT RESOURCES PROCESS: SIGNIFICANT MILESTONES <br />PHASE 1 - PUBLIC CONSULTATION <br /> <br />Action <br /> <br />Completion Date <br /> <br />Notice of Initiation of Public Consultation, GCP Act <br />Replacement Resources Methods Report, <br />(59 FR 40357) <br /> <br />August 8, 1994 <br /> <br />FRN Mailing <br /> <br />August 10,1994 <br /> <br />Notice of Public Consultation Meetings <br />(59 FR 51191) <br /> <br />October 7, 1994 <br /> <br />FRN (and Information Packet) Mailing <br /> <br />October 20, 1994 <br /> <br />Public Consultation Meetings <br /> <br />November 1994 <br /> <br />End of Public Comment Period <br /> <br />December 19, 1994 <br /> <br />Appendix A of this report contains the Federal Register notices. the Information Packet, <br />and other documentation of Phase I of the process. <br /> <br />1.2.2 PHASE 2 -IDENTIFICATION OF ACCEPTABLE METHODS <br /> <br />Phase 2, the "Identification of Acceptable Methods" stage of the Replacement Resources <br />Process. began in January 1995 with the analysis of public comments, the identification of <br />technical issues by R W. Beck, and the formulation of key policy issues by Western, <br />
The URL can be used to link to this page
Your browser does not support the video tag.