My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04428
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04428
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:26 PM
Creation date
10/12/2006 12:19:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP
Basin
Colorado Mainstem
Date
3/1/1988
Author
WAPA
Title
Replacement Resources Processes - Final Methods Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />March 1998 <br /> <br />Western Area Power Administration <br /> <br />1-5 <br /> <br /> <br />Section 1 <br /> <br />Introduction <br /> <br />The Replacement Resources Process to date, including the Methods Report completed in <br />Phase 2, examines only the feasible methods for evaluating power supply alternatives to <br />replace the generating capability made unavailable at OCD. The actual solicitation, <br />evaluation, acquisition, and integration of replacement resources by Western will occur <br />later, in the next phase of the process. The final operating criteria at OCD, the ultimate <br />SLCAIIP marketable resource, and the customers' replacement resource demand are not <br />precisely defined at present. Additional changes in these parameters could also occur in <br />the future based on research and long-term monitoring at OCD, operational changes at <br />other federal facilities, and future changes in resource decisions by Western's customers. <br />This report therefore identifies economically and technically feasible methods appropriate <br />to a wide range of potential future replacement resource needs. <br /> <br />Table 1-2 summarizes both completed and projected milestones for Phase 2 of Western's <br />Replacement Resources Process. <br /> <br />TABLE 1-2 <br /> <br />REPLACEMENT RESOURCES PROCESS: SIGNIFICANT MILESTONES <br />PHASE 2 - IDENTIFICATION OF ACCEPTABLE METHODS <br /> <br />Action <br /> <br />Completion Date <br /> <br />Newsletter Updates, Mailings <br /> <br />February 1995 <br />October 1995 <br />December 1996 <br /> <br />Notice of Availability, Draft Replacement Resources <br />Methods Report, Public Consultation Meetings, <br />Public Comment Period <br /> <br />July 1996 <br /> <br />FRN Mailing <br /> <br />July 5, 1996 <br /> <br />Public Information/Comment Meetings <br /> <br />July 1996 <br /> <br />Close of Public Comment Period <br /> <br />September 3, 1996 <br /> <br />Notice of Availability of Final Replacement <br />Resources Methods Report <br /> <br />March 1998 <br /> <br />Completion of Phase 2 <br /> <br />March 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.