Laserfiche WebLink
<br />2. Rat ing factl:lr-s. (E~ee attachment #:~:) <br /> <br />'f~1) <br /> <br />~ <br />N <br />00. <br />W <br /> <br />a. Type of p~-ojec.t, 3t"-0U.P or- indivirjual. <br /> <br />b. Priority area (If work. <br /> <br />c. Scope of work to be done. <br /> <br />d. Schedule (If application fot- \Yot-k to be <br />completed. <br /> <br />e. E:-{tent of needed Sal inity Control work <br />completed under I)ther programs. <br /> <br />f. Coordination with another project. <br /> <br />3- Si3n-up period. <br /> <br />E. Monitoring and Evaluation IM&EI <br /> <br />Objectives of the Monitoring and Evaluation are: <br /> <br />1. To quantify through a data gathering and evaluation activity <br />the salt I~ad reduction attributable to improved irrigation <br />water management. <br /> <br />f;{i) <br /> <br />2. To provide farmers with improved technical assistance for <br />achieving irrigation water management. <br /> <br />3. T,,, evaluate changes in wetland and wi Idl ife habitat ,-esulting <br />from improved irrigation systems and irrigation water <br />marlagement. <br /> <br />4. To determirle local eCI)nornic impacts I)f this sal inity pt-oject. <br /> <br />5. To determine changes that should be made in the project to <br />acl"lieve sal inity c(lntr-c,1 objectives. <br /> <br />The M&E program, to be implemented on representative farms and crops in <br />.the at-ea, will monitor sUt-face inflow, pr-ecipitati.::.n and surfa.ce outflow to <br />determine the aml)unt of water- that inf; I tt-a.tes into the soi I. Weather data <br />wi I I be evaluated to estimate evap(lt~anspi~ation (ET) requirements of <br />the c,.," P s. The d iff ere n c e bet wee r, i n f i I t ,- at ion and ET w i I I ,- e fie c t de e p <br />percolation. Salt load reductlorl attributed to irrigation water mana3emerlt <br />wi II be based on t"educed deep pet'co!ation.Soi I moistut~e lHj II be rnonitot-ed <br />tel assess the ur.ifor-mity with which it-t~igati(ln water- is applied and to <br />check the validity of applyin3 I~T evaluation act-oss the p,-io'-ity a,-ea. <br />Also, \oIetlar,d and wi Idl ife habitat '..Ii II be rnonitc,t-ed to establ ish basel ine <br />data, to ,jetennine changes in habitat quality and quantity with project <br />implementation, and to assess the effect of the voluntary program for <br />r-ep I acernent of IN i I d I i Fe va lues fot.eg(,ne. One m>)n i tot"" i ng site and one <br />',' <br />.-. weather stati':'f1 have been insta\ led. <br /> <br />4 <br />