My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04411
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:21 PM
Creation date
10/12/2006 12:19:04 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.600
Description
Colorado River Basin Salinity Control - Federal Agencies - USDA
Basin
Colorado Mainstem
Water Division
5
Date
4/23/1991
Title
Colorado River Salinity Control Program - Lower Gunnison No 2 - Delta County
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />E:. EI igit,le F't-actice" and C(,st-Share Levels 1/ <br /> <br />'.;.:;~:<~ <br /> <br />w <br />I\) <br />00 <br />...;t <br /> <br />1. On-Farm Salt Load Reduction: (SRP-l) - 70% cost <br />share (See attachment #2 for components and <br />effective I ifespan.l <br /> <br />2. Off-Fann Salt Load F:eduction: ISRP-21 - 70:': <br />cost share (See attachment #2 for components and <br />effective I ifespan.l <br /> <br />3. Pet-manent Wildl ife HO.bitat: (SRP-::n - 70/: cost <br />share (See attachment #2 for components and <br />effective I ifespan.l <br /> <br />4. Shallow Water At"eas F':<," I'li Idl ife:(SRP-4l - 70:'; <br />cost share (See attachmel1t #2 for components and <br />effective lifespan.) <br /> <br />1/ See attached Cost-Share DocJ,et for more specific information <br />on Cost-Shareing. <br /> <br />III. Implementation Activities <br /> <br />A. Technical Assistance <br /> <br />1. On farm plannins arid implementation began in FY 1991 with an <br />:?l.~~..~ allocation of $99,000 in Technical Assistance funds. <br />",,:";.;J.' <br /> <br />B. Cost-Share Assistance <br /> <br />1. First year funding fOt~ contt-acts, totaling $300,000 was <br />received in FY-91. <br /> <br />2. At the present tjme ~everal projected contracts are foreseen <br />need i rrg State (:,;,mmi ttee Ot- DASCO a~'p'-oval. The projects and needs wi II be <br />identified in future PIP and cC1nstr"uction updates. <br /> <br />:3. To faci I itate the attainment of wi Idl ife habitat to repiace <br />prc,jected values for-gofle, due to futut.e sal irlity practice ap~l\ ica.tiorl, an <br />accelerated appJ ication program is needed to take advantage of situations <br />that ar-e presenting themselves at this time. "AppJ ications for- wi Idl ife <br />habitat practices, exclusively, that are not within the Priority Area but <br />within the Sal inity Prosrarn At-ea wi i I t,e considered fot- c(,rrtt-act <br />developmer,t." A wildlife 13iol')gist has been added to the F.O. Staff te. <br />assist in wildlife hatlitat plannios, inventot-ies and adherence to NEF'A and <br />SCS wetland policies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.