Laserfiche WebLink
<br />.}.:;J.\ <br />'.:',:" <br /> <br />w. <br />W <br />Q <br />.... <br /> <br />~:(~~}. <br /> <br />"f'.": <br /> <br />RATING FACTORS <br /> <br />TYPE OF PROJECT: <br /> <br />Gt-C1up projects wi.11 have pt"ior-ity ovet- individual prcljects. as <br />Ions as they are wlthin the scope of the program. <br /> <br />PRIORITY AREA: <br /> <br />WSOO',' ---------- 15 po ints <br />WS008 ---------- 12 po ints <br />WS011 ---------- 09 po i nts <br />WS007 ---------- 06 po ints <br />WS012 ---------- 03 po ints <br /> <br />SCOPE OF WORK: <br /> <br />Salt t~eductil)n and wildlife --------- 15 points <br />Salt reduction only ----------------- 10 points <br />Wi I d life on I y ----------------------- 03 po i nts <br /> <br />SCHEDULE OF APPLICATION: <br /> <br />Less tharl 5 <br />Mot'"e than'S <br /> <br />yea,-s <br />yea,-s' <br /> <br />,05 po i nts <br />O~: points <br /> <br />EXTENT OF SALINITY CONTROL WORK DONE: <br /> <br />More than 50% ----------------------- 05 points <br />Less than 50% ----------------------- 03 points <br /> <br />COORDINATION WITH ANOTHER PROJECT: <br /> <br />Yes --------------------------------- 05 points <br />No ---------------------------------- 01 point <br /> <br />SIGN-UP PERIOD: <br /> <br />All appl ications wi i I be sel'"viced acce,,-ding to I'"anking aftel'" a~'plyiTl9 <br />the above I'"ating system to each. High priority jobs wi I I be planned <br />t.efot-e proceed i ns to IOl"o,ler pt- i or i ty jobs. App J i cants unab I e to rnake <br />firm planning dec~s~ons w\\' be serviced when decisions can be made. <br />Appl ications f,-om a p,-evious sign-up wi II be siven an additior,al five <br />(5) points when a new sign-up is added to the p,-iority listir,g. The <br />additional (5) points ",ill be giver, one time only. A seconda,-y <br />priority system based on cost per ton ($60/ton) of salt t-eductiljrt wi II <br />be used when there al'"e more salt plans than funds for contl'"acting. <br /> <br />ATTACHMENT #3 <br />