My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04388
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04388
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:32:17 PM
Creation date
10/12/2006 12:18:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8271.300
Description
Colorado River-Colorado River Basin Salinity Control Program-General Information/Publications
State
CO
Date
12/1/1977
Author
SoilCon-DeptAgricult
Title
On-Farm Program for Salinity Control-Final Report of the Grand Valley Salinity Study-Prepared by Soil Conservation Service and Agricultural Research Service
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />--- <br /> <br />~. <br /> <br />Colorado River Basin Salinity Control Project <br />Grand Valley Unit <br /> <br />The area selected for Stage One construction lies entirely within <br />\ <br />one drainage basin, drained by Reed Wash, and is bound on the north <br /> <br />by the Government Highline Canal and on the south by the Kiefer Extension. <br /> <br />Stage One construction will consist of lining 6.7 miles of the <br /> <br />Government Highline Canal between Big Salt Wash on the east to Highline <br /> <br />Lake intake on the west. Fourteen existing laterals totaling 34.2 miles <br /> <br />will be replaced by twelve pipe laterals totaling 29.7 miles. Eleven <br /> <br />direct farm turnouts from the canal will be replaced. <br /> <br />Land irrigated in the Stage One area totals about 6,300 acres <br /> <br />including Y,720 acres served by laterals and 580 acres served by direct <br /> <br />farm turnouts from the canal. <br /> <br />Schedule: <br /> <br />--- <br /> <br />~-- <br />1) Environmental Assessment - end of calendar year 1977 <br /> <br />2) Definite Plan Report - early calendar year 1978 <br /> <br />3) Field station construction - spring 1978 <br /> <br />4). Canal construction - fall 1978 <br /> <br />1690 <br /> <br />" <br /> <br />" <br />
The URL can be used to link to this page
Your browser does not support the video tag.