Laserfiche WebLink
<br />SUMMARY SHEETS (Continued) <br /> <br />WATER SUPPLY <br /> <br />Project supply (average acre-feet annually) <br />Irrigation . . . . . . . <br />Municipal and industrial use . <br />Stream fishery . . . . . <br />Future fish and wildlife development <br />Total . . . . . . . . <br />Effects on Colorado River (annual average) <br />Stream depletion (acre-feet) . . . . . <br />Increase in salt load (tons) . . . . . . , , <br />Increases in salinity concentration at Imperial Dam (mg/l) <br />From concentrating effects of stream depletion. <br />From increase in salt load. . . . . . . . . . . . . , , <br /> <br />, . <br /> <br />IRRIGATION SERVICE AREAS (acres) <br /> <br />Dolores Water Conservancy District <br />Dove Creek area (full service) . . . . . . . <br />Montezuma Valley area (supplemental service) <br />Sub total. . . . . . . . . . <br />Ute Mountain Ute Indian Reservation <br />Towaoc area (full service) <br />Total . . . . . . . . . . . <br /> <br />, . <br /> <br />ESTIMATED COSTS <br /> <br />Construction costs (October 1975 prices) <br />McPhee Dam and Reservoir, Great Cut Dike . . . . . . . . . , <br />Monument Creek Dam and Reservoir . . . . . . . . , . . . . <br />Great Cut Pumping Plant, Switchyard, and Transmissip~ Lipe <br />Sprinkler Pumping Plants, Switchyards, and Transmis~ion Lines. <br />Dove Creek and South Canals and Laterals <br />Dolores Tunnel and Canal . . . . . . . . <br />Towaoe Canal, Laterals, and Transmission Line <br />Cortez-Towaoc Pipeline . ..... <br />Drains . . . . . . . . . . . . . . . . <br />Dolores protective dikes and landfill. <br />Permanent operating facilities . . <br />Operation and maintenance housing. <br />Recreational facilities. . . . . . <br />Fish and wildlife facilities . . . <br />Service facilities, depreciation, and salvage~ <br />Archaeological salvage . . . <br />Future year capacity . . . . <br />Total construction cost <br /> <br />. , <br /> <br />, . <br /> <br />, . <br /> <br />Annual operation, maintenance, and replacement <br />costs (1973-75 prices) <br /> <br />3 <br /> <br />90,900 <br />8,700 <br />25,400 <br />1,600 <br />126,600 <br /> <br />80,900 <br />10,080 <br /> <br />8.4 <br />1.0 <br /> <br />27,860 <br />26,300 <br />54,160 <br /> <br />7,500 <br />61,660 <br /> <br />$59,290,000 <br />2,400,000 <br />12,100,000 <br />9,800,000 <br />38,320,000 <br />10,080,000 <br />32,270,000 <br />2,980,000 <br />4,880,000 <br />1,200,000 <br />1,760,000 <br />130,000 <br />5,927,000 <br />5,039,000 <br />-976,000 <br />700,000 <br />100,000 <br />186.000,000 <br /> <br />869,500 <br />