My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04349
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:01 PM
Creation date
10/12/2006 12:17:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.800
Description
Denver Basin and South Platte River Basin Technical Study
State
CO
Basin
South Platte
Date
8/1/1984
Author
SEO
Title
Report of Groundwater Legislation Committee
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />allot her mat t er s .a.~6f>i!:i-e.~e-~&-~tieft-~e-a~4.et'\s RELEV ANr TO <br />DETERMINING WHETHER THE PROl?OSEO 'USE WILL BE CONSISTENl' WITH <br />OJMMISSION CRITERIA. With regard to whether a pcofOsed use <br />will impair uses under existing water rights, impairment <br />shall incl ude ~t\e-~fl~eaSefia-t:>ie--!ewei!'~fl~-ei-~fl~-wa-t.el'-~e"'ie-l, <br />~ the unreasonable deterioration of water q..1ality, beyond <br />reasonabl e economi c 1 imi ts of w4.~fl4~-a.wa~-&l! us e. <br />(6) THE STATE ENGINEER SHALL ACT TO GRAN!' OR DENY A <br />PERMIT PURSUANl' TO THIS SEcrICN WITHIN 180 DAYS OF THE IAST <br />DATE OF THE PUBLICATION REQUIRED BY SUBSEcrION (2) OF THIS <br />SEerrOO; PROVIDED, HOWEVER, THAT IF THE OOMMISSION HAS Nor <br />ADcPTED 'CRITERIA FOR THE AQUIFER FROM WHlaI WATER IS PRO- <br />POSED TO BE DIVERl'ED, THE STATE ENGINEER SHALL Acr TO GRAN!' <br />OR DENY A PERMIT W.ITHIN 180 DA,YS OF THE FINAL AD<X'TION OF <br />SUQI CRITERIA. FAILURE TO Acr WITHIN SUQi TIME LIMITS SHALL <br />BE DEEMED" AT THE ceTION OF THE APPLI CANT, A DENIAL OF THE <br />PERMIT. <br />.( 7) evERY PERMI't ISSUED BY THE STATE ENGINEER <br />PURSUANT. TO THIS SEcrION,.J)HALL-CLEARLY STATE TmT THE <br />. ISSUANCE'- OF THE' PERMIT IS Nor AN ASSURANCE AND roES Nor <br />GUARANTEE THAT GROUND 'WATER WILL BE AVAILABLE IN THE AIDUN!' <br />STATED IN THE PERMIT AT THE TIME THE PERMIT IS ISSUED OR AT <br />ANY TIME IN THE FurURE. <br />(8) THE Q)MMISSION SHALL ESTABLISH AND MAY REVISE, AS <br />NECESSARY, A SCHEDULE OF NONREFUNDABLE ANNUAL FEES FOR THE <br />PROCESSING OF APPLICATIONS FOR PERMITS SUBJEcr TO THE <br />PROVISIONS OF SEcrION 37-90-107 SUFFICIENT TO COVER THE <br />
The URL can be used to link to this page
Your browser does not support the video tag.