Laserfiche WebLink
<br />I <br /> <br />I i (1': '!- 'j ,) <br />,.... ..,j.....,.,)I. <br /> <br />13 <br /> <br />I: <br /> <br />Tunnel irrigation rights; 2) basin rank between the Tunnel and Taylor <br /> <br />I <br /> <br />Park; 3) basin rank between Taylor Park and Blue Mesa; 4) basin rank <br /> <br />between Blue Mesa and the P&M rights (3233) and 5) basin rank greater than <br /> <br />I <br /> <br />3233. The principal water rights and the depletions between Blue Mesa and <br /> <br />Crystal were not considered in calculating these proportions. <br /> <br />I <br /> <br />I <br /> <br />Rs a starting point, this distribution of priorities was applied to <br /> <br />93,000 acre feet of depletions above Blue Mesa projected by the USBR in <br /> <br />I <br /> <br />the CRSS studies, as shown in Table 2. <br /> <br />I <br /> <br />I <br /> <br /> TRBLE 2: Fraction of Projected Depletions by Basin Rank <br />Class " of Total Difference Declet ion (af) <br />BR ( 588 (Gunnison Tunnel) 4 4 3,720 <br />BR ( 2052 (Taylor Park) 29 25 23,250 <br />BR ( 2937 (Blue Mesa) 58 29 26,'370 <br />BR ( 3223 (P & Ml 63 5 4,650 4,762 <br />BR l 3223 100 37 34.410 35.238 <br /> TOTRL 93,000 40,000 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Since the projected depletions junior to the Curecanti decrees (BRl29371 <br /> <br />I <br /> <br />only total 39,060 acre feet, these depletions were factored up to 4,762 <br /> <br />I <br /> <br />and 35,238 acre feet so as to provide for the full 40,000 acre feet of <br /> <br />subordination above Blue Mesa. <br /> <br />R monthly demand pattern for these 40,000 <br /> <br />I <br /> <br />acre feet of depletion was then developed based on the following mix of <br /> <br />uses. year-round municipal and industrial - 10", storage during runoff - <br /> <br />I <br /> <br />45", direct flow irrigation - 45". <br /> <br />I <br />I <br /> <br />WBLR, Inc. 1909 Broadway, #3, Boulder, Colorado 80302 <br /> <br />I <br />