Laserfiche WebLink
<br />AF Diverted <br />(Delivered to) <br />Indian Wash <br />86,000 AF +/- 5% <br />August - October <br />1992 - 1994 <br />. Turnout Demands <br />(50,500 AF +/- 10%) <br />. Seepage <br />(4,000 AF +/- 10%) <br />. Conveyance Spill <br />(31,500 AF +/- 10%) <br /> <br />Conservable <br />Spill <br />28,500 AF +/- 10% <br />August - October <br />1992 - 1994 <br />. High Flow Spills <br />(15,900 AF +/- 30%) <br />. Demand Fluctuation <br />Spills <br />(12,600 AF +/- 30%) <br /> <br />Conveyance <br />Spill <br />31,500 AF +/- 10% <br />August - October 1994 <br />. Conservable Spill <br />(28,500 AF +/- 10%) <br />. Reasonable Operation <br />Margin Spill <br />(3,000 AF +/- 10%) <br /> <br />High Flow Spills <br /> 15,900 AF +/- 30% <br /> August - October <br /> 1992 - 1994 <br /> Existing Need to Run <br /> High Flow Rates Late in <br /> Summer <br />. Better Control at Start of High line Canal <br /> - SCADA at East End <br /> - Orchard Mesa Power Canal Turnout <br /> - Tunnel No.3 Outlet Improvements <br /> - Bypass Turnout <br />. Modify and Install Check Gates <br /> - Modify Existing Checks <br /> -7 New Checks <br /> - New Controllers on Existing Checks <br />