Laserfiche WebLink
<br />.V' 5. <br /> <br />Benefits and allocated costsl/ <br /> <br />Average <br />annual <br />benefi ts <br />($1,000) <br /> <br />Direct' <br />(%) <br /> <br />Total <br />Average <br />annual <br />Equivalent <br />allocated <br />costs.!.! <br />($1,000) <br /> <br />Number <br />of <br />Benefici- <br />aries <br />People <br /> <br />Electric power, <br />Nav. - Recreational <br />- Commercial <br />Flood protection <br />Existing <br />Future <br />Irrigation <br />Direct <br />Total <br />M&I water supply <br />Recreation (Includes F&WL Rec.) <br />F&WL (Conservation) <br />Unemployment benefits <br />Beach erosion <br />Existing <br />Future <br />Hurricane Portection <br />Existing <br />Future <br />Other <br /> <br />Pre-Authorization costs~/ <br /> <br />. <br />, <br /> <br />50 <br /> <br />2 <br /> <br />47 <br /> <br />3,000 <br /> <br />423 <br />580 <br />1,962 <br />791 <br /> <br />13 <br /> <br />571 <br /> <br />8,200 <br /> <br />61 <br />24 <br /> <br />936 <br />725 <br /> <br />22,400 <br />354,000 <br /> <br />-23 <br /> <br />Stream depletionl/ <br /> <br />34 <br /> <br />Direct 3,226 2,290 <br />Total 3,381i/ 100 2,290 387,600 <br />1/ Based on project interest rate and total benefits. <br />2/ Pre-authorization costs have been subtracted because they have no <br />efficiancy in benefit-cost analysis <br />1/ Assigned costs of holdover storage in the Upper Colorado River <br />System. <br />i/ Includes $157,000 of indirect benefits, <br /> <br />, <br />" <br />, <br /> <br />I <br /> <br />i <br />:i <br /> <br />7 <br />