Laserfiche WebLink
<br />, <br /> <br />ADDRESS REPLY To <br />PROJECT ENGINEER <br /> <br />UNITED STATES <br />DEPARTMENT OF THE INTERIOR <br />BUREAU OF RECLAMATION <br />SAN LUIS VALLEY PROJECT <br /> <br />MONTE VISTA, eOL-ORACO <br /> <br />Monthly Report <br />tm~ -~ 1960 <br /> <br />Rio Grande Division <br /> <br />'llie Project Manager attended a meeting of the Board of <br /> <br />Directors of the San Luis Valley Water Conservancy District on <br /> <br />September 15, 1960. 'lliere was much discussion about a proposal <br /> <br />to fom a "loosell. organization of agencies interested in water <br /> <br />development in Southern Colorado. Plans were made for several <br /> <br />Directors to attend the nex~ meeting of the National Reclamation <br /> <br />Association to be held in Bakersfield, California in Novembe~. <br />Closed Basin Division <br /> <br />The regular quarterly measurements of the depth of <br /> <br />water were made in selected wells located throughout the Project <br /> <br />area during the latter part of the month. <br /> <br />Conejos Division <br /> <br />On September 20, the Project Manager and the Gate- <br /> <br />Tender inspected the outlet pipe at Platoro Dam and Reservoir. <br /> <br />Very minor deterioration of the coal tar enamel lining was found. <br /> <br />It is planned to make repair.s during May 1961. <br /> <br />(- ,,-' ~ l~ . 7--' <br />\J " .', .i.......... <br />