Laserfiche WebLink
<br />GUNNISON COUNTRY TIMES, GUNNISON, COLORADO <br />SEPTEMBER 20, 1976 <br /> <br />SHEet lof 3 <br /> <br />West Elk Wilderness to be affected <br /> <br />Is Fruit~and Mesa just <br />another pork barrel project~ <br /> <br />By DON FROST <br />The Bureau of Reclamation's proposed Fruitland Mesa <br />Project, which would entail the construction of a fluc- <br />tuating reservoir on Soap Creek in Gunnison County, has <br />been described as everything from a worthwhile irrigation <br />project, to a detriment to wildlife, to a pork barrel <br />program. <br /> <br />The public, Oct. 7, will have its chance to voice opinions <br />on the project when a' public hearing on the project's Draft <br />Environmental Statement(DES) is held from 2 to 9 p.m. in <br />the Crawford School Gymnasium at Crawford. <br />Meanwhile, one fact remains clear. As the DES points <br />out, "Significant beneficial, as well as adverse, en- <br /> <br />, vironmental,impacts would be expected to result from the <br />project. .. <br />According to the DES, the pirmary beneficial impacts <br />would come from increasing irrigation supplies a!1d im- <br />proving the economic slabtiity of agriculture in the area. <br />Reservoircbased recreation, inclUding increased fish. <br />availability, would be developed. <br />, "The main adverse impacts would be related to fish and <br />wildlife habitat losses through inundation, reduced stream- <br />flows, and loss of terrestrial wildlife habitat to irrigated <br />farminp;. " <br /> <br />THE PRINCIPAL FEATURE of the project would be <br />the 584-surface acre reservoir on Soap Creek. An aqueduct <br /> <br />would convey water from this reservoir to project lands <br />south of Crawford. Construction of the projecl is <br />scheduled to begin in early 1977. <br /> <br />According to the DES, the purpose and need for the <br />project is to supply an aqueduct and dependable sup- <br />plemental irrigation supply for the Fruitland Mesa Project <br />lands. The lands now are not adequately irrigated with <br />direct diversions from Crystal and Iron Creeks, according <br />to the DES. <br />. In addition to irrigating the 6,310 acres of land now <br />irrigated, an additional 11,940 acres of land would be <br />irrigated. The agricultural yield would be increased on <br />18,250 acres of land. <br /> <br />An increased level of annual gross farm income would' <br />rc;sult soon after delivery of project water, 'the en, <br />vlronmental statement says, although it would be from 15 <br />to ~O years before the full agriculturalpoteniial of rhe <br />project would be realized. It is expecled that gross farm in- <br />come would ultimately be increased by $2.8 million an- <br />nually. . <br />The project was authorized for constructi'1n in 19&1'un- <br />der the Col.orado River Storage Project, and is $ponsored <br />b~ the FrUitland Mesa Water Conservancy Dislrict. who <br />Will repay the !3ureauof Reclamation for reimbursable <br />project costs and for project construction and operalion. <br />(Turn to Page 4) <br />