Laserfiche WebLink
<br />r-- <br />a: <br />C'. <br />C\I <br /> <br /><:. <br /> <br />VI <br /> <br />INTRODUCTION <br />.:"" - -}1' ~ r.,. ~ . <br />Pmver <br /> <br />Chapj,f'f VI nf'Ah~ wit,h (,IH' HOOVPf Durn power r.ont.fads of lfliJO, <br />whieh were re.quiren by t.lH' Project Act. as a connil.ion precenent. to <br />thp. mnkillg of 8,pproprintions and tho commencement oC construelion. <br />Part. VI of t.h(\ nppcndixf's includes only t.he genernl regulat.ions of <br />1930.-31 and n. tahulation 01 the contracts made t.}wrrumler, these <br />rp.gnlnlions n.nd (~ontraets having hf'f'n superseded by those mode in <br />1941 (eh. VITI, infra) under the Boulder Canyon Projed Anjustment <br />Ad. <br />Chnptl'l' VII slJmmarh~('s bril'f1y the compliallf'(' wit.h lIw f'olldi- <br />tions prccedeul. 1.0 construction, follow",] hy UIC approprinl,ions for <br />sno thn ronst,ruction of, Hoover Dam and power plant. PR,rt V II <br />of t.lw nppf'ndixf's t.almln.tf'R cf'rt,nin mntrrinl reln.Hog f,heTf'.t.o. <br />Chapter Vllf neals with t.lw Rouldor Canyon Project. Adjustment <br />Act of 1940., under which the Hoover Dam rates were rearljuste(L <br />Po.rt VlIl or I.he appennixes contains tho text of Ihat .I.atuto and <br />relntp,cl mat.erial. <br />Chap tor IX 811mlllfLrizn.~ t.ho Hoover Dam power eontrnct.s mnde <br />under Uw AdjUf~I,mcnt Act, and part IX of the o.I'JlmHli~('n<; eonl.nins <br />Ihe tox/" of the 1941 regulations and controcts. <br /> <br />Water <br /> <br />Chapter X deols with the Hoover Dnm water-storo.ge contracts <br />(other than the All-American Conal repnyment contracts, which are <br />t,rented separately in ch. XI). rnrt X of the appendixes eonln;ns <br />the texl,. of I.he corresponding contract.. <br />Chapter XI is concomed with the AlI.American Cn"al and the <br />repaymenl, contracts mInting thereto, nnn part XI of the appennixes <br />f'oll{'('t.~ thp. !\t,aLutAA and tho t,eds of the contrnct,q on t,hnt subjec.t. <br /> <br />Related Project... <br /> <br />Chnpter X II refel'll briefly to the projects which are more or less <br />directly relaten to the Rouldor Canyon project, some of which ore <br />integrated with it by statute, othel'll by contract, and aU of which <br />utilize waters stored by Hoover Dam. These are Parker Dam, the <br />Colorado Hiver aqueduct ann its "an Diego branch, IIeadgato Rock <br />Dn.m, tho Pulo Verde weir, the Colorado River front work, tho Yuma <br />and Gila projects, Da.is Dam, the Morelos Dam in Mexico, ann the <br />"comprehensive plan of development." Part XII of the nppennixes <br />contairis the statutes, principal contracts, and relnteo materinl, <br />hearing on the..e projects. <br />