Laserfiche WebLink
<br />TABLE OF CONTENTS (Cont'd) <br /> <br />Page <br /> <br />2. TERMINAL RESERVOIR <br />3. WATER RIGHTS <br />B. ANIMAS RIVER <br />1. WATER RIGHTS <br />2. ANIMAS RIVER PUMPING STATION AND FORCE MAIN <br />C. OTHER UNQUANTIFIED WATER RIGHTS <br />D. WATER TREATMENT PLANT INFLUENT LINE <br /> <br />5-2 <br /> <br />5-3 <br />5-5 <br />5-5 <br />5-8 <br /> <br />5-8 <br />5-9 <br /> <br />CHAPTER 6 - EXISTING TREATED WATER FACILITIES <br />A. WATER TREATMENT PLANT <br />B. DISTRIBUTION SYSTEM <br />1. GENERAL DESCRIPTION <br />2. 1980 MODEL CALIBRATION <br />3. SYSTEM STORAGE <br /> <br />6-1 <br />6-1 <br />6-4 <br /> <br />6-4 <br />6-5 <br />6-6 <br /> <br />CHAPTER 7 - ANIMAS-LA PLATA PROJECT <br />A. PROJECT DESCRIPTION <br />B. PROJECT WATERS ALLOCATED TO DURANGO <br />C. PROJECT COSTS ALLOCATED TO DURANGO <br />1. ALLOCATION METHOD <br />2. SINGLE PURPOSE ALTERNATIVE <br />3. SEPARABLE JOINT AND SPECIFIC COSTS <br />4. PROPERTY TAX <br />5. OTHER CONSIDERATIONS <br /> <br />7-1 <br />7-1 <br />7-2 <br />7-3 <br />7-3 <br />7-3 <br />7-4 <br />7-8 <br />7-8 <br /> <br />CHAPTER 8 - WATER QUALITY <br />A. RAW WATERS <br />1. FLORIDA RIVER <br />2. ANIMAS RIVER <br />3. TERMINAL RESERVOIR <br /> <br />8-1 <br /> <br />8-1 <br />8-1 <br />8-1 <br /> <br />8-1 <br /> <br />TC-2 <br /> <br />J. <br />