<br />I I
<br />IV
<br />
<br />...--v
<br />
<br />+-~L
<br />1').-
<br />
<br />PROJ ECT LI FE: 100 years
<br />ANNUAL O.M.&R.: $133,800
<br />COSTS BASED ON: 1964 Prices
<br />PROJECT ACREAGE: 26,800 Acres
<br />
<br />
<br />CEDAR RAPIDS DIVISION
<br />
<br />LOCATION:
<br />SPONSORS:
<br />FEATURES:
<br />
<br />Central Nebraska in Greeley, Boone, Nance and Wheeler Counties
<br />Cedar Val ley Reclamation District
<br />Spalding Dam and Reservoir, Belgrade Diversion Dam
<br />
<br />Ericson Lake
<br />
<br />,
<br />~~
<br />
<br />CEDAR RAPIDS DIVISION
<br />BUREAU of RECLAMATION
<br />
<br />CONSTRUCTION PERIOD: 7 Years (Partial Water
<br />Delivery after 4 years)
<br />TOTAL ANNUAL COST: $1,254,300
<br />BENEFIT-COST RATIO: 1.40 to 1.00
<br />
<br />SPALDING DAM
<br />AND RESERVOIR
<br />
<br /> Table I - Averaqe Annual Proiect Benefits
<br /> Irriqation Fish & Wildlife Recreation Flood Cont Total
<br />Direct Benefits $ 1 , 207 ,600 $ 58,900 $ 37,000 $ 14,000 $ 1 ,31 7 ,500
<br />Indirect Benefits 439,300 -0- -0- -0- 439,300
<br />IT ota I Benefits $ 1 646 900 $ 58 900 $ 37.000 $ 14 000 $1 756.800
<br />
<br />Table 2 - Pro'ect Costs and Reoavment bv ource
<br /> Irriaation Fish & Wi I d life Recreation Flood Cont. Total
<br />Share of
<br />Project Costs $31,599,000 $ 1 ,41 4,000 $ 576,000 $ 351,000 $33,940,000
<br />Amount Reimbur. 31 599 000 72 000 119 000 -0- 31 790,000
<br />Non-reimbursable -0- $ 1,342,000 $ 457,000 $ 35 1 ,000 $ 2, I 50 ,000
<br />M.R.B.P. 24,714,000 -0- -0- -0- 24,714,000
<br />Non-Federal (State) -0- 12,000 119,000 -0- 191,000
<br />Local 6.885 000 -0- -0- -0- 6 885 000
<br />
<br />Table 5 - Land Acquisition
<br />(acres)
<br />
<br />Feature Fee Easement Total
<br />Spalding 7,963 4 7,967
<br />Pibel Lake 67 -- 67
<br />Belgrade 650 33 683
<br />Other 1,648 1,243 2,891
<br />Fish & Wildlife 465 19 484
<br />Recreation 160 -- 160
<br />Total Acres 10 953 I 299 12 252 ~
<br />
<br />Table 3 - Avera e Annual Water R ulrements
<br />
<br />Crop Irrigation Requirement: 1.03 ac.ft./ac.
<br />Farm Delivery Requirement: 1.47 ac.ft./ac.
<br />Diversion Requirement: 2.94a.f./ac. Spalding
<br />3.45a.f./ac. Belgrade
<br />Total Diversion Requirement: 76,800 ac.ft.
<br />Return Flow: Not Avai lable
<br />Streamflow Depletion: 61,400 a.f. Spalding
<br />17,400 a.f. Belgrade
<br />
<br />S
<br />
<br />o
<br />
<br />5
<br />
<br />10
<br />
<br />miles
<br />
<br />~
<br />
<br />Table 4 - Dam & Reservoir Data
<br />Spalding Dam
<br />Height: 86 feet
<br />Spi I Iway Capacity:
<br />Drainage Area: 630
<br />Spalding Reservoir
<br />Caoacitv Acre-Feet
<br />Surcharge 26,820
<br />Sediment 1.500/50 yr-3,200/100yr
<br />Conservation 46,000
<br />Total 81,430*
<br />Area Acres
<br />Surcharge Pool 4,370
<br />Conservation Pool 3,570
<br />*Excludes Surcharge
<br />
<br />\
<br />
<br />o
<br />
<br />I
<br />I
<br />, BOONE
<br />
<br />-----
<br />
<br />NANC
<br />
<br />Length: 4,860 feet
<br />2 ,680 c. f. s .
<br />Square mil es
<br />
<br />LEGEND )}
<br />PROPOSED RESERVOIR -....Ii! ~
<br />PROPOSED DIVERSION DAM ~
<br />PROPOSED CANAL ----
<br />PROPOSED RIVER SIPHON ~...+_
<br />PROPOSED PUMPING PLANT <>
<br />PROPOSED IRRIGABLE AREA C6
<br />EXISTING RESERVOIR 41
<br />
<br />7-3
<br />
<br />~ .\
<br />
|