Laserfiche WebLink
<br />I <br />m <br />'n <br />a <br /> <br />ground to current operators for a set fee of $8,400 per year. <br /> <br />This lease has been offered to the Washington County Conser- <br /> <br />a <br />~ <br />a <br />~ <br /> <br />vancy District for $20,000. <br />would be less than $100,000. <br /> <br />The present worth of the lease <br /> <br />If the Bureau of Reclamation is serious in proceeding with <br /> <br />the necessary studies with ~he District, the District is con- <br /> <br />templating purchasing the lease to gain control of the spring <br /> <br />site. This could save substantial economical and environmental <br /> <br />problems. The District would propose turning over the springs <br /> <br />rt <br />tj <br /> <br />to the State Parks and Recreation Department as part of the <br /> <br />Quail Creek Recreation Facilities. <br /> <br />J <br />~ <br />~ <br /> <br />PROJECT COST <br /> <br />The cost for the project, as outlined above is shown in <br /> <br />1 <br />~ <br /> <br />the following table. The costs include the clay lining alter- <br /> <br />native. If the clay liner is not needed, a major cost reduc- <br /> <br />tion would be achieved. <br /> <br />I <br /> <br /> <br />n('.\')~)80 <br />\} '.." ... \, <br /> <br />I <br />I <br /> <br />P6/L6 <br /> <br />CREAMER AND NOBLE ~N.CONSUL T1NG ENGINEERS <br /> <br />..,...."'"'~,...<..;. ~~.._ ~_ - c. ~_~ ~""'. <br />