Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br /> <br />PHASE II <br /> <br />Assuming the results of Phase I are positive, the follow- <br /> <br />ing should then proceed: <br /> <br />1. Develop more detailed mapping and quantities for the <br /> <br />proposed facility. . <br /> <br />2. Complete a geologic investigation of the site. <br />Exhibit 5 indicates the location of drill holes <br /> <br />recommended. <br /> <br />3. Develop design criteria. <br /> <br />4. Develop final plan. <br /> <br />PHASE III <br /> <br />As Phase II is being developed, Bureau of Reclamation <br /> <br />would develop an environmental impact statement on the proposed <br /> <br />project. <br /> <br />Or~~08 <br />~iv..Jv <br /> <br />P6/L12 <br /> <br />CREAMER AND NOBLE ~N ,CONSULTING ENGINEERS <br />