My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04202
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:54:13 PM
Creation date
10/12/2006 12:12:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8062.200
Description
Federal Reserved Water Rights - USFS - Water Division 2 - Negotiating Principles and Settlement
State
CO
Basin
Arkansas
Water Division
2
Date
3/10/1997
Author
D Randolph Seaholm
Title
Technical Workgroup - Group 1 Stream Summary - March 10 1997
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />e <br /> <br />000186 <br /> <br />at <br /> <br />Amount: A CWCB instream flow of 8 cfs year round is acceptable at the QP. The <br />CWCB instream flow extends from the headwaters to the Arkansas River confluence. <br />CDOW should validate the recommendations at the QP given the extensive road <br />construction occurring on the west side of Weston Pass and the reduced watershed size <br />the QP as compared to the CWCB instream flow reach, This needs to be added to the <br />current workplan, <br /> <br />63C Twobit Gulch <br />New QP at sec I - liS - 80W; 100 yards above private inholdings <br />Amount: A CWCB instream flow of 2 cfs year round is acceptable at the QP. <br /> <br />65D Black Cloud Creek <br />QP at sec 27 - 11S - 81W; on north section line <br />Amount: A CWCB instream flow of 2 cfs year round is acceptable at the QP, <br /> <br />65E Crystal Lake Creek <br />QP at sec 28 - liS - 81W; 100 feet above private inholdings and just below Wilderness <br />Boundary <br />Amount: A CWCB instream flow recommendation needs to be made and would likely <br />be deemed acceptable. <br /> <br />65F Echo Creek <br />QP at sec 20 - 11 S - 81 W; 100 feet above the USFS Boundary near Lake Ck. confluence <br />Amount: A CWCB instream flow of 2 cfs year round is acceptable at the QP, <br /> <br />65G La Plata Gulch <br />QP at sec 30 - 11 S - 81 W; 100 feet above private inholding boundary <br />Amount: A CWCB instream flow recommendation needs to be made and would likely <br />be deemed acceptable. <br /> <br />65H South Fork Lake Creek <br />QP at sec 35 - liS - 82W; 100 feet upstream of the private lands <br />Amount: A CWCB instream flow of 8 cfs year round is acceptable at the QP. <br /> <br />651 North Fork Lake Creek <br />New QP at sec 22 - liS - 82W; 100 feet upstream of the Twin Lakes Tunnel <br />Amount: A CWCB instream flow of 10 cfs year round is acceptable. This instream flow <br />extends from the headwaters to the confluence with the South Fork. CDOW should <br />validate the recommendation at the QP, The QP is considerably upstream of the South <br />Fork confluence and inflows from Twin Lakes Tunnel transmountain diversion, In <br />addition, USFS requests a high flow between May I and July 15 of at least 70% of <br />bankfull and up to 120 % of bankfull to move sands in the stream as a result of sanding <br />Independence Pass (?), Group wanted more definition (limits) on the high flow request <br />and assurance that there would be some upstream exchange potential particularly during <br />runoff. <br /> <br />67 A Low Pass Gulch <br />QP at sec 28 - liS - 79W; 100 feet upstream of the west section line (forest boundary) <br />Amount: A CWCB instream flow of2 cfs year round is acceptable at the QP, <br /> <br />4 <br /> <br />j, <br />
The URL can be used to link to this page
Your browser does not support the video tag.