Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />e <br /> <br />000186 <br /> <br />at <br /> <br />Amount: A CWCB instream flow of 8 cfs year round is acceptable at the QP. The <br />CWCB instream flow extends from the headwaters to the Arkansas River confluence. <br />CDOW should validate the recommendations at the QP given the extensive road <br />construction occurring on the west side of Weston Pass and the reduced watershed size <br />the QP as compared to the CWCB instream flow reach, This needs to be added to the <br />current workplan, <br /> <br />63C Twobit Gulch <br />New QP at sec I - liS - 80W; 100 yards above private inholdings <br />Amount: A CWCB instream flow of 2 cfs year round is acceptable at the QP. <br /> <br />65D Black Cloud Creek <br />QP at sec 27 - 11S - 81W; on north section line <br />Amount: A CWCB instream flow of 2 cfs year round is acceptable at the QP, <br /> <br />65E Crystal Lake Creek <br />QP at sec 28 - liS - 81W; 100 feet above private inholdings and just below Wilderness <br />Boundary <br />Amount: A CWCB instream flow recommendation needs to be made and would likely <br />be deemed acceptable. <br /> <br />65F Echo Creek <br />QP at sec 20 - 11 S - 81 W; 100 feet above the USFS Boundary near Lake Ck. confluence <br />Amount: A CWCB instream flow of 2 cfs year round is acceptable at the QP, <br /> <br />65G La Plata Gulch <br />QP at sec 30 - 11 S - 81 W; 100 feet above private inholding boundary <br />Amount: A CWCB instream flow recommendation needs to be made and would likely <br />be deemed acceptable. <br /> <br />65H South Fork Lake Creek <br />QP at sec 35 - liS - 82W; 100 feet upstream of the private lands <br />Amount: A CWCB instream flow of 8 cfs year round is acceptable at the QP. <br /> <br />651 North Fork Lake Creek <br />New QP at sec 22 - liS - 82W; 100 feet upstream of the Twin Lakes Tunnel <br />Amount: A CWCB instream flow of 10 cfs year round is acceptable. This instream flow <br />extends from the headwaters to the confluence with the South Fork. CDOW should <br />validate the recommendation at the QP, The QP is considerably upstream of the South <br />Fork confluence and inflows from Twin Lakes Tunnel transmountain diversion, In <br />addition, USFS requests a high flow between May I and July 15 of at least 70% of <br />bankfull and up to 120 % of bankfull to move sands in the stream as a result of sanding <br />Independence Pass (?), Group wanted more definition (limits) on the high flow request <br />and assurance that there would be some upstream exchange potential particularly during <br />runoff. <br /> <br />67 A Low Pass Gulch <br />QP at sec 28 - liS - 79W; 100 feet upstream of the west section line (forest boundary) <br />Amount: A CWCB instream flow of2 cfs year round is acceptable at the QP, <br /> <br />4 <br /> <br />j, <br />