My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04186
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:54:08 PM
Creation date
10/12/2006 12:11:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.400
Description
Fryingpan-Arkansas Project - Report
State
CO
Basin
Arkansas
Water Division
5
Date
1/1/3000
Author
unknown
Title
Fryingpan-Arkansas Project Colorado
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />064:1 <br /> <br />The <br />Western <br />Slope <br /> <br />Roaring Fork Riller <br /> <br /> <br />Auedi Dam and Reservoir <br />provides storage for <br />replacement waler for <br />western Colorado users. <br />This stored waler can be <br />released 10 regulate stream <br />flows and preserve senior <br />waler rights in the area. It <br />will also be used for <br />municipal and industrial <br />purposes, irrigation, fish <br />and wildlife enhancement, <br />and recreation. <br /> <br />~~"!.~ ". <br /> <br />Ruedi Reservoir <br /> <br />The North and South Side <br />Collection Systems of the <br />project divert and carry <br />water from the Fryingpan <br />and Roaring Fork River <br />basins to the inlet portal of <br />the Charles H. Boustead <br />Tunnel. The 5.4-miJe tunnel <br />conveys all water from the <br />collection systems through <br />the Continental Divide and <br />into TurquOise Lake. <br /> <br />9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.