Laserfiche WebLink
<br />-) <br /> <br />- <br />-.J <br /> <br />STREAMFLOW <br />Streamflow for Colorado River, Green River and San Juan River stations for February 1997 are shown in <br />Table 3, Data presented in the following table was obtained from the monthly report of streamflow and <br />reservoir contents in the Upper Colorado River Basin, as provided by the U,S. Geological Survey Water <br />Resources Division, Utah Dis1ricl. A comparison of monthly streamflow to average monthly streamflow during <br />an 84,year period from 1914 to 1997 is presented for each river in Figure 3 on page 5, <br /> <br />Table 3, Streamflow for the Colorado River, Green River and San Juan River, February 1997 <br /> PERCENT CUMULATIVE PERCENT 84 YEAR <br /> 84 YEAR MONTHLY (1914-1997) <br /> FEBRUARY (1914-1997) (OCT-FEB) CUMULATIVE <br /> DISCHARGE FEBRUARY DISCHARGE (OCT-FEB) <br /> (1000 aJ,) DISCHARGE (1000 aJ,) DISCHARGE <br />COLORADO RIVER <br />near Cisco, UT 252,1 1,344,2 <br />Adjusted (a) 178,1 107,7% 1,123,8 116,3% <br />GREEN RIVER <br />at Green River, UT 249,8 1,041,0 <br />Adjusted (b) 146,2 109,0% 685,2 103,7% <br />SAN JUAN RIVER <br />near Bluff, UT 44.3 285,3 <br />Adjusted (c) 52,9 77,3% 289,3 89.4% <br />TOTAL 546,1 2,670,5 <br />Adjusted 377.2 2,098,3 <br />COLORADO RIVER <br />at Lees Ferry (d) 1,256.0 4,474,8 <br /> <br />(a) Adjusted for change in storage in Blue Mesa Reservoir. Storage began in Blue Mesa Reservoir on October 27, 1965, <br />(b) Adjusted for change in storage in Flaming Gorge and Fontenelle Reservoirs, Storage began in Flaming Gorge Reservoir on <br />November 1, 1962, and in Fontenelle Reservoir in October of 1964, <br />(c) Adjusted for change i~ Navajo Reservoir. Storage began on June 27,1962, Not adjusted for San Juan,Chama diversions, <br />(d) Exclusive of Paria River discharge, <br /> <br />POWER GENERATION <br />Power generation at Colorado River Storage Project power plants for February 1997 is presented in Table 4, <br />Information shown was obtained from the Monthly Report of Power Operations, Bureau of Reclamation Upper <br />Colorado Regional Office, <br /> <br />Table 4, <br /> <br />Power generation at Colorado River Storage Project power plants, February 1997 <br />NET GENERATION CUMULATIVE <br />FOR FEBRUARY MONTHLY (OCT-FEB) <br />(megawatt hrs) GENERATION (MW hrs) <br /> <br />Fontenelle 4,420 22,628 <br />Flaming Gorge 56,219 221,526 <br />Blue Mesa 27,4 71 115,820 <br />Morrow Point 33,462 113,439 <br />Crystal 18,570 77,982 <br />Glen Canyon 594,042 2,176,322 <br />TOTAL 734,184 2.727,716 <br /> 4 <br />