Laserfiche WebLink
<br />. nOlO"r? <br /> TABLE 4 - Continued <br />. Precip. Cortez Total Flow Base Flow Incremental <br /> Beginning Precip. at State Line at State Line Flow <br /> Date (inches) (acre-feet) (acre-feet ) (acre-feet) <br /> 1970 <br /> 7-5 0.68 2,260 1,190 1,100 <br />. 8-4 1.26 1,050 520 530 <br /> 9-4 1.96 8,950 2,130 6,800 <br /> 10-22 0.57 460 330 130 <br /> 11-26 0.74 630 360 270 <br /> 1971 <br />. 5-5 1.10 2,660 980 1,700 <br /> 8-4 1.17 1,810 500 1,300 <br /> 8-18 2.01 5,000 1,040 4,000 <br /> 10-16 1.92 4,340 1,520 2,800 <br /> 12-23 0.69 2,080 740 1,300 <br />. 1972 <br /> 10-4 6.56 10,470 1,920 8,600 <br /> 1973 <br /> 3-5 3.12 16,310 4,580 11,700 <br /> 6-2 0.89 2,740 1,300 1,400 <br />. 7-18 1.23 3,020 1,250 770 <br /> 9-9 1.00 2,280 1,100 1,200 <br /> 1974 <br /> 7-15 1.00 1,130 180 950 <br /> 10-28 3.30 2,440 1,350 1,100 <br />. <br /> 1975 <br /> 3-9 1. 73 2,240 1,040 1,200 <br /> 7-10 1.32 3,620 1,850 1,800 <br /> 9-8 1.13 1,770 1,010 760 <br />. 1976 <br /> 2-4 2.09 1,610 1,260 350 <br /> 5-6 0.72 1,580 1,030 550 <br /> 7-23 1.62 2,270 910 1,400 <br /> 9-24 1. 61 1,410 360 1,100 <br />. 1977 <br /> 8-15 1.17 380 30 350 <br /> 9-11 0.60 230 20 210 <br /> 11-6 0.63 320 70 250 <br />. <br /> <br />. <br />