Laserfiche WebLink
<br />o ()'2 4 8 5 <br /> <br />. <br /> <br />define any subsequent approaches and actions needed to meet the overall goals. <br /> <br /> <br />Additional description of the proposed Program can be obtained by contacting the <br /> <br /> <br />Platte River EIS Office at the address above, <br /> <br /> <br />Programmatic EIS <br />The impacts of the proposed Program and alternatives ..ill be evaluated through a <br /> <br />PElS, This assessment will look at the effects of the proposed Program and alternatives <br /> <br />primarily upon the habitat of the four target threatened and endangered species along the <br /> <br />Central Platte River in Nebraska in order to assess the degree to which each alternative <br /> <br />achieves the program purposes, Other impacts offue alternatives will be examined more <br /> <br />broadly, Once a preferred alternative is selected for implementation, further NEP A <br /> <br /> <br />compliance may be required for site"specific Federal actions, For example, the PElS will <br /> <br /> <br />examinc the effects of restoring the original storage in Pathfinder Reservoir upon the <br /> <br /> <br />\vater operations of Reclamation's North Platte reservoirs and the downstream effects <br /> <br /> <br />upon the habitat of the target species. If this element is part of the ultimately selected <br /> <br />Program, an additional site-specific NEP A study would likely need to be undertaken to <br /> <br /> <br />assess, for example, the construction impacts of raising Pathfinder Dam. Similarly, it is <br /> <br /> <br />expected that the PElS will examine the benefits to the habitat of the target species from a <br /> <br /> <br />range of water conservation measures throughout the Platte River Basin, including the <br /> <br />costs of such measures and their broad effects on factors such as water use, associated <br /> <br />revenues, and local taxes. However, further WEP A compliance may be required prior to <br /> <br />implementing specific conservation measures in specific locations. <br /> <br />A Draft PElS is scheduled for completion by rnid-J 999, <br />9 <br /> <br />. <br /> <br />. <br />