Fruitland Mesa Project
State
CO
Basin
Gunnison
Water Division
4
Date
3/1/1976
Author
CWCB
Title
Fruitland Mesa Project - March 1976
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water allocation: . <br /> <br />Irrigation (17,750 acres) 51,800 a.f. <br />Public water supply 15 a.f. <br />(Black Canyon National Monument) <br /> <br />Total 51,815 a.f. <br /> <br />Annual depletion of the Colorado River 21,800 a.f. <br /> <br />Benefit-cost ratio 1.8 to 1 <br /> <br />Total annual benefits $ 4,359,000 <br /> <br />Environmental. Impact <br /> <br />a. Construction of Soap Park Reservoir (Milly K. Goodwin Lake) <br />will create aesthetic changes to the landscape by access: roads, dam <br />construction, and increased human activity that will affect the <br />experience of those persons using the West Elk Wilderness. The wil- <br />derness area is adjacent to the proposed reservoir development. <br /> <br />b. Water quality of Soap Creek will be enhanced and minimum flows <br />will be maintained which may lead to establishing a kokanee salmon run <br />from Blue Mesa Lake. <br /> <br />c. The establishment of a minimum pool in Gould Reservoir, where <br />one presently does not exist, will establish a year-round fishery in <br />the reservoir. <br /> <br />Current Status <br /> <br />Advance planning studies were initiated in FY 1965 and the definite <br />plan report was completed in 1967. The repayment contract between the <br />United States and the Fruitland Mesa Water Conservancy District was <br />exeucted in 1969. Petitions for project irrigation have been essen- <br />tially completed. <br /> <br />Archaeological surveys have been completed for the reservoir and <br />tunnel sites and negotiations are under way for an archaeological <br />survey of the rest of the project area to be made by the University of <br />Colorado for the National Park Service. An environmental assessment <br />has been ci:tculated and cormnents have been received. The draft envi- <br />ronmental statement is scheduled for completion in the spring of 1976. <br />Preconstruction drilling of the Black Mesa Conduit has been completed. <br /> <br />The President has included $3,000,000 in his proposed budget for <br />FY 1977 to continue construction of this project. <br /> <br />Replacement of two inadequate and failing siphons in the existing <br />Gould Canal was completed in FY 1972. <br /> <br />Total investigation costs to June 30, 1975, including feasibility <br />and advance planning studies and a completed drainage and minor <br /> <br />-2- <br />