My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04149
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:53:59 PM
Creation date
10/12/2006 12:10:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.911
Description
Miscellaneous Small Projects and Project Studies - SE Needs Assessment and PSOP
State
CO
Basin
Arkansas
Water Division
2
Date
4/19/2001
Author
PSOP Implementation
Title
Final PSOP Implementation Committee Report Addendum to Preferred Storage Options Plan Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Final PSOP Implementation Committee Report <br /> <br />Page 21 of 23 <br /> <br /> 228E Studies I II II I <br /> Feasibility I May '02 I I November '03 I <br /> Studies <br />Authorization Authorizing Introduction Passage May '05 <br />of Legislation Feb. '04 <br />Enlargement <br />Projects <br />Contracting NEPAlEIS October '05 September '07 <br />wi Work <br />Reclamation <br />and Water Executive November January '08 <br />Users Master '07 <br /> Storage <br /> Contract <br /> wlReclamation <br /> Executive February '08 July '08 <br /> Allotment <br /> Contracts <br /> wlWater Users <br />Enlargement Construction October '08 3 to 4 years from <br />of Pueblo Project at through May start date <br />Reservoir Pueblo Dam '09 <br />and <br />Turquoise Construction Probable 3 to 4 years from <br />Reservoir Project at start date start date <br /> Sugarloaf 2020 <br /> DamfTurquoise <br /> <br />Section 13 - Participants and Acknowledgement <br /> <br />The development of the PSOP Implementation Committee Report involved the major municipal <br />and agricultural water providers in the Southeastern Colorado Water Conservancy District. <br />These entities worked with District staff over the last 5 months to add the necessary details to <br />the PSOP. Many of these water user groups have been active participants in the District's 3- <br />year study process. Their efforts, along with the other participants in the Storage Study <br />Committee, helped to produce the Water and Storage Needs Assessment Report (December <br />'98), the Preferred Storage Options Plan Report (September '00), and now the PSOP <br />Implementation Committee Report (April '01). <br /> <br />We acknowledge and thank the many participants in the District's study process for their <br />contribution toward the development of a plan of action to meet future, District-wide water <br />storage needs. The successful implementation of the Preferred Storage Options Plan, as <br />amended by the PSOP Implementation Committee Report, will depend upon the continued <br />hard work and cooperation of all the District's constituents. <br /> <br />Storage Study Committee Participants <br /> <br />3/20102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.